If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394223307002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.397575,"lon":-113.110883,"icon":""}]} |
Location: 00/07-33-039-22W4/2 | |
Location Alias: 00/07-33-39-22 W4M | |
Location Alias 2: 00/07-33-039-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 22 | |
Section: 33 | |
County/Municipality: Lacombe County | |
Well Name: EMBER NEVIS 7-33-39-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0186723 | |
License Date: 1996-03-12 | |
License Status: Issued | |
Spud Date: 1996-03-19 | |
Final Drill Date: 1996-03-21 | |
Well Total Depth: 761.00 m | |
Surface Hole Latitude: 52.397575 | |
Surface Hole Longitude: -113.110883 |
Date | Event |
---|---|
1996-03-12 | Obtained License |
1996-03-19 | Surface Casing Operation Performed |
1996-03-21 | Finished Drilling |
1996-03-21 | Well Log Performed |
1996-03-21 | Well Mode changed to Drilled and Cased |
1996-03-22 | Production Casing Operation Performed |
1996-03-22 | Rig Released |
1996-03-26 | Perforation Treatment Performed - Jet Perforation |
1996-03-26 | Well Log Performed |
1996-05-01 | Perforation Treatment Performed - Jet Perforation |
1996-05-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-14 | Perforation Treatment Performed - Jet Perforation |
1996-05-25 | Perforation Treatment Performed - Jet Perforation |
1996-06-01 | Perforation Treatment Performed - Fractured |
1996-06-17 | Perforation Treatment Performed - Jet Perforation |
1996-06-29 | Well Log Performed |
1996-07-01 | Perforation Treatment Performed - Fractured |
1996-07-01 | Perforation Treatment Performed - Jet Perforation |
1996-08-01 | Well Began Production |
1996-08-01 | Well Fluid changed to Gas |
1996-08-01 | Well Mode changed to Flowing |
2004-08-01 | Well Fluid changed to Gas |
2004-08-01 | Well Mode changed to Pumping |
2008-10-02 | Perforation Treatment Performed - Jet Perforation |
2008-10-02 | Well Log Performed |
2008-10-02 | Well Structure changed to Commingled |
2008-10-28 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-26 | Perforation | 610.60 | 615.00 | 20 |
1996-06-17 | Perforation | 328.00 | 331.00 | 20 |
1996-07-01 | Perforation | 323.50 | 328.00 | 20 |
1996-07-01 | Fracture | 323.50 | 331.00 | 0 |
2008-10-02 | Perforation | 262.50 | 263.00 | 14 |
2008-10-02 | Perforation | 270.00 | 273.00 | 14 |
2008-10-02 | Perforation | 277.50 | 278.50 | 14 |
2008-10-02 | Perforation | 282.00 | 283.00 | 14 |
2008-10-02 | Perforation | 314.00 | 315.00 | 14 |
2008-10-02 | Perforation | 321.00 | 323.50 | 14 |
2008-10-02 | Perforation | 349.00 | 349.50 | 14 |
1996-05-01 | Perforation | 554.50 | 556.70 | 20 |
2008-10-02 | Perforation | 350.50 | 351.50 | 14 |
2008-10-02 | Perforation | 359.00 | 360.00 | 14 |
2008-10-02 | Perforation | 367.00 | 368.00 | 14 |
2008-10-02 | Perforation | 374.00 | 375.00 | 14 |
2008-10-02 | Perforation | 400.00 | 401.00 | 14 |
2008-10-28 | Fracture | 262.50 | 323.50 | 0 |
2008-10-28 | Fracture | 349.00 | 401.00 | 0 |
1996-05-13 | Packing Device Capped w/Cement | 592.00 | 600.00 | 0 |
1996-05-14 | Perforation | 465.00 | 470.00 | 20 |
1996-05-14 | Perforation | 475.60 | 478.40 | 20 |
1996-05-14 | Perforation | 479.80 | 481.50 | 20 |
1996-05-25 | Perforation | 445.00 | 448.00 | 20 |
1996-05-25 | Perforation | 455.80 | 459.30 | 20 |
1996-06-01 | Fracture | 445.00 | 459.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3597 | 0.0 | 0.0 | 0.0 |
1997 | 8580 | 0.0 | 0.0 | 0.0 |
1998 | 8759 | 0.0 | 0.0 | 0.0 |
1999 | 8740 | 0.0 | 0.0 | 0.0 |
2000 | 8751 | 0.0 | 0.0 | 0.0 |
2001 | 8681 | 0.0 | 0.0 | 0.0 |
2002 | 8729 | 0.0 | 0.0 | 0.0 |
2003 | 8756 | 0.0 | 0.0 | 0.0 |
2004 | 8775 | 0.0 | 0.0 | 0.0 |
2005 | 8747 | 0.0 | 0.0 | 0.0 |
2006 | 8716 | 0.0 | 0.0 | 0.0 |
2007 | 8725 | 0.0 | 0.0 | 0.0 |
2008 | 6554 | 0.0 | 0.0 | 0.0 |
For data sources see[5]