X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394231716000

Well Details

Well ID: 0394231716000
Loading map...
Location: 00/16-17-039-23W4/0
Location Alias: 00/16-17-39-23 W4M
Location Alias 2: 00/16-17-039-23 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 23
Section: 17
County/Municipality: Lacombe County
Well Name: EMBER ALIX 16-17-39-23
Operator Name: Ember Resources Inc.
License Number: 0408205
License Date: 2009-01-20
License Status: Amended
Spud Date: 2009-01-28
Final Drill Date: 2009-01-29
Well Total Depth: 761.00 m
Surface Hole Latitude: 52.360037
Surface Hole Longitude: -113.268388

For data sources see[1][2]

Well History

Date Event
2009-01-20 Obtained License
2009-01-28 Surface Casing Operation Performed
2009-01-29 Finished Drilling
2009-01-29 Production Casing Operation Performed
2009-01-29 Rig Released
2009-01-29 Well Log Performed
2009-01-29 Well Mode changed to Drilled and Cased
2009-02-09 Perforation Treatment Performed - Jet Perforation
2009-02-10 Perforation Treatment Performed - Jet Perforation
2009-02-11 Well Fluid changed to Gas
2009-02-11 Well Mode changed to Testing
2009-02-13 Perforation Treatment Performed - Jet Perforation
2009-02-16 Perforation Treatment Performed - Fractured
2009-02-17 Well Fluid changed to Coalbed Methane-Coals and Other
2009-02-17 Well Mode changed to Testing
2009-07-15 Well Began Production
2009-07-15 Well Fluid changed to Coalbed Methane-Coals and Other
2009-07-15 Well Mode changed to Flowing
2010-09-30 Perforation Treatment Performed - Jet Perforation
2010-10-08 Well Fluid changed to Coalbed Methane-Coals and Other
2010-10-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-09 Perforation 344.50 345.50 20
2009-02-13 Perforation 308.60 309.10 13
2009-02-13 Perforation 305.50 306.00 13
2009-02-13 Perforation 316.50 317.50 13
2009-02-13 Perforation 332.10 332.60 13
2009-02-13 Perforation 322.10 322.60 13
2009-02-13 Perforation 425.60 426.10 13
2009-02-13 Perforation 435.00 436.00 13
2009-02-13 Perforation 447.50 448.50 13
2009-02-13 Perforation 402.80 403.30 13
2009-02-13 Perforation 420.60 421.10 13
2009-02-09 Perforation 384.00 387.00 20
2009-02-13 Perforation 422.50 423.00 13
2009-02-16 Fracture 377.90 379.90 0
2009-02-16 Fracture 402.80 448.50 0
2009-02-16 Fracture 305.50 332.60 0
2009-02-16 Fracture 358.40 374.30 0
2009-02-16 Fracture 384.00 387.00 0
2009-02-16 Fracture 344.50 345.50 0
2009-02-16 Fracture 530.50 532.00 0
2009-02-16 Fracture 516.50 517.50 0
2010-09-30 Perforation 745.00 747.00 17
2009-02-10 Perforation 530.50 532.00 20
2009-02-10 Perforation 516.50 517.50 20
2009-02-13 Perforation 368.70 369.20 13
2009-02-13 Perforation 358.40 358.90 13
2009-02-13 Perforation 370.40 370.90 13
2009-02-13 Perforation 377.90 379.90 13
2009-02-13 Perforation 373.80 374.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 3602 0.0 0.0 0.0
2010 8539 0.0 0.0 0.0
2011 8723 0.0 0.0 0.0
2012 8661 0.0 0.0 0.0
2013 8613 0.0 0.0 0.0
2014 8499 0.0 0.0 0.0
2015 8660 0.0 0.0 0.0
2016 8324 0.0 0.0 0.0
2017 8438 0.0 0.0 0.0
2018 8029 0.0 0.0 0.0
2019 8153 0.0 0.0 0.0
2020 1869 0.0 0.0 0.0

For data sources see[5]

References