If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394232109003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.370372,"lon":-113.248461,"icon":""}]} |
Location: 00/09-21-039-23W4/3 | |
Location Alias: 00/09-21-39-23 W4M | |
Location Alias 2: 00/09-21-039-23 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 23 | |
Section: 21 | |
County/Municipality: Lacombe County | |
Well Name: EMBER NEVIS 9-21-39-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0226253 | |
License Date: 1999-09-13 | |
License Status: Amended | |
Spud Date: 1999-09-23 | |
Final Drill Date: 1999-09-23 | |
Well Total Depth: 815.00 m | |
Surface Hole Latitude: 52.370372 | |
Surface Hole Longitude: -113.248461 |
Date | Event |
---|---|
1999-09-13 | Obtained License |
1999-09-23 | Finished Drilling |
1999-09-23 | Well Mode changed to Drilled and Cased |
1999-09-25 | Production Casing Operation Performed |
1999-09-25 | Rig Released |
1999-09-25 | Well Log Performed |
1999-09-30 | Perforation Treatment Performed - Jet Perforation |
1999-09-30 | Well Log Performed |
1999-10-15 | Perforation Treatment Performed - Fractured |
1999-10-24 | Perforation Treatment Performed - Jet Perforation |
1999-11-05 | Perforation Treatment Performed - Jet Perforation |
2009-02-04 | Perforation Treatment Performed - Jet Perforation |
2009-02-04 | Well Log Performed |
2009-02-05 | Perforation Treatment Performed - Fractured |
2009-04-20 | Well Began Production |
2009-04-20 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-04-20 | Well Mode changed to Flowing |
2009-08-10 | Well Log Performed |
2010-09-30 | Well Log Performed |
2011-09-14 | Well Log Performed |
2012-08-08 | Well Log Performed |
2013-07-29 | Well Log Performed |
2015-07-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-09-30 | Perforation | 743.50 | 746.00 | 20 |
2009-02-04 | Perforation | 315.00 | 316.00 | 14 |
2009-02-04 | Perforation | 318.00 | 319.00 | 14 |
2009-02-04 | Perforation | 322.00 | 323.00 | 14 |
2009-02-04 | Perforation | 328.00 | 329.00 | 14 |
2009-02-04 | Perforation | 334.00 | 336.00 | 14 |
2009-02-04 | Perforation | 338.00 | 340.00 | 14 |
2009-02-04 | Perforation | 362.00 | 363.00 | 14 |
2009-02-04 | Perforation | 373.00 | 374.00 | 14 |
2009-02-04 | Perforation | 377.00 | 381.00 | 14 |
2009-02-04 | Perforation | 400.00 | 401.00 | 14 |
1999-10-15 | Fracture | 743.50 | 746.00 | 0 |
2009-02-04 | Perforation | 416.50 | 417.50 | 14 |
2009-02-04 | Perforation | 419.00 | 420.00 | 14 |
2009-02-04 | Perforation | 425.50 | 426.50 | 14 |
2009-02-04 | Perforation | 436.50 | 437.50 | 14 |
2009-02-04 | Perforation | 439.00 | 440.00 | 14 |
2009-02-04 | Perforation | 445.00 | 446.00 | 14 |
2009-02-04 | Perforation | 452.50 | 453.50 | 14 |
2009-02-05 | Fracture | 180.00 | 453.50 | 0 |
1999-10-24 | Perforation | 526.00 | 531.00 | 17 |
1999-11-05 | Perforation | 523.00 | 524.00 | 17 |
1999-11-05 | Perforation | 500.00 | 502.50 | 17 |
2009-02-04 | Perforation | 180.00 | 181.00 | 14 |
2009-02-04 | Perforation | 194.00 | 195.00 | 14 |
2009-02-04 | Perforation | 214.00 | 215.00 | 14 |
2009-02-04 | Perforation | 313.00 | 313.50 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 5883 | 0.0 | 0.0 | 0.0 |
2010 | 8677 | 0.0 | 0.0 | 0.0 |
2011 | 8688 | 0.0 | 0.0 | 0.0 |
2012 | 8388 | 0.0 | 0.0 | 0.0 |
2013 | 8580 | 0.0 | 0.0 | 0.0 |
2014 | 8337 | 0.0 | 0.0 | 0.0 |
2015 | 4343 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]