X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241404000

Well Details

Well ID: 0394241404000
Loading map...
Location: 00/04-14-039-24W4/0
Location Alias: 00/04-14-39-24 W4M
Location Alias 2: 00/04-14-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 14
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 4-14-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030677
License Date: 1966-07-07
License Status: Suspension
Spud Date: 1966-07-20
Final Drill Date: 1966-08-04
Well Total Depth: 1920.20 m
Surface Hole Latitude: 52.348881
Surface Hole Longitude: -113.360641

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-07 Obtained License
1966-08-01 Drill Stem Test Performed
1966-08-01 Perforation Treatment Performed - Jet Perforation
1966-08-02 Drill Stem Test Performed
1966-08-04 Finished Drilling
1966-08-04 Well Mode changed to Drilled and Cased
1966-08-05 Production Casing Operation Performed
1966-08-12 Perforation Treatment Performed - Jet Perforation
1966-08-15 Well Began Production
1966-08-15 Well Fluid changed to Crude Oil
1966-08-15 Well Mode changed to Flowing
1966-08-16 Perforation Treatment Performed - Acid Wash - No Pressure
1966-08-23 Perforation Treatment Performed - Jet Perforation
1966-08-24 Perforation Treatment Performed - Acid Wash - No Pressure
1966-08-25 Well Fluid changed to Crude Oil
1966-08-25 Well Mode changed to Flowing
1976-10-24 Well Log Performed
1977-08-19 Well Log Performed
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Suspended
1983-01-14 Perforation Treatment Performed - Cement Squeeze
1983-01-18 Perforation Treatment Performed - Jet Perforation
1983-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-01 Well Fluid changed to Crude Oil
1983-02-01 Well Mode changed to Pumping
1996-05-01 Well Fluid changed to Crude Oil
1996-05-01 Well Mode changed to Suspended
1998-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-04-10 Plug Back Performed
1998-04-10 Well Fluid changed to Crude Oil
1998-04-10 Well Mode changed to Abandoned Zone
1998-06-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-01 Perforation 1855.60 1856.80 13
1998-04-10 Packing Device Capped w/Cement 1842.00 1850.00 0
1966-08-12 Perforation 1861.70 1863.50 13
1966-08-16 Acid Wash 1855.60 1863.50 0
1966-08-23 Perforation 1890.40 1891.60 13
1966-08-24 Acid Wash 1855.60 1891.60 0
1983-01-14 Cement Squeeze 1855.60 1863.50 0
1983-01-18 Perforation 1856.00 1856.60 13
1983-01-19 Acid Treatment 1856.00 1856.60 0
1998-04-10 Packing Device Capped w/Cement 1871.00 1879.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 2887 0.0 0.0 0.0
1968 3551 0.0 0.0 0.0
1969 3893 0.0 0.0 0.0
1970 4962 0.0 0.0 0.0
1971 1104 0.0 0.0 0.0
1978 30 0.0 0.0 0.0
1979 744 0.0 0.0 0.0
1983 7760 0.0 0.0 0.0
1984 7831 0.0 0.0 0.0
1985 5346 0.0 0.0 0.0
1986 5664 0.0 0.0 0.0
1987 5068 0.0 0.0 0.0

For data sources see[5]

References