X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241404002

Well Details

Well ID: 0394241404002
Loading map...
Location: 00/04-14-039-24W4/2
Location Alias: 00/04-14-39-24 W4M
Location Alias 2: 00/04-14-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 14
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 4-14-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030677
License Date: 1966-07-07
License Status: Suspension
Spud Date: 1966-07-20
Final Drill Date: 1966-08-04
Well Total Depth: 1920.20 m
Surface Hole Latitude: 52.348881
Surface Hole Longitude: -113.360641

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-07 Obtained License
1966-08-01 Drill Stem Test Performed
1966-08-01 Perforation Treatment Performed - Jet Perforation
1966-08-02 Drill Stem Test Performed
1966-08-04 Finished Drilling
1966-08-04 Well Mode changed to Drilled and Cased
1966-08-05 Production Casing Operation Performed
1966-08-12 Perforation Treatment Performed - Jet Perforation
1966-08-16 Perforation Treatment Performed - Acid Wash - No Pressure
1966-08-23 Perforation Treatment Performed - Jet Perforation
1966-08-24 Perforation Treatment Performed - Acid Wash - No Pressure
1966-08-25 Well Began Production
1966-08-25 Well Fluid changed to Crude Oil
1966-08-25 Well Mode changed to Flowing
1976-10-24 Well Log Performed
1977-08-19 Well Log Performed
1983-01-14 Perforation Treatment Performed - Cement Squeeze
1983-01-18 Perforation Treatment Performed - Jet Perforation
1983-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-13 Well Fluid changed to Crude Oil
1988-09-13 Well Mode changed to Pumping
1996-05-01 Well Fluid changed to Crude Oil
1996-05-01 Well Mode changed to Suspended
1998-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-04-10 Plug Back Performed
1998-04-10 Well Fluid changed to Crude Oil
1998-04-10 Well Mode changed to Abandoned and Whipstocked
1998-06-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-01 Perforation 1855.60 1856.80 13
1998-04-10 Packing Device Capped w/Cement 1842.00 1850.00 0
1966-08-12 Perforation 1861.70 1863.50 13
1966-08-16 Acid Wash 1855.60 1863.50 0
1966-08-23 Perforation 1890.40 1891.60 13
1966-08-24 Acid Wash 1855.60 1891.60 0
1983-01-14 Cement Squeeze 1855.60 1863.50 0
1983-01-18 Perforation 1856.00 1856.60 13
1983-01-19 Acid Treatment 1856.00 1856.60 0
1998-04-10 Packing Device Capped w/Cement 1871.00 1879.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 2034 0.0 0.0 0.0
1968 2438 0.0 0.0 0.0
1969 2733 0.0 0.0 0.0
1970 3205 0.0 0.0 0.0
1971 6784 0.0 0.0 0.0
1972 120 0.0 0.0 0.0
1978 5554 0.0 0.0 0.0
1979 7609 0.0 0.0 0.0
1980 7980 0.0 0.0 0.0
1981 8351 0.0 0.0 0.0
1982 7462 0.0 0.0 0.0
1983 7247 0.0 0.0 0.0
1984 8287 0.0 0.0 0.0
1985 8638 0.0 0.0 0.0
1986 8003 0.0 0.0 0.0
1987 8452 0.0 0.0 0.0
1988 8643 0.0 0.0 0.0
1989 6754 0.0 0.0 0.0
1990 1351 0.0 0.0 0.0
1991 1800 0.0 0.0 0.0

For data sources see[5]

References