If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394242412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.370636,"lon":-113.337138,"icon":""}]} |
Location: 00/12-24-039-24W4/0 | |
Location Alias: 00/12-24-39-24 W4M | |
Location Alias 2: 00/12-24-039-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 24 | |
County/Municipality: Lacombe County | |
Well Name: KMG DECALTA CLIVE 12-24-39-24 | |
Operator Name: Kerr-McGee Operating Corporation | |
License Number: 0029010 | |
License Date: 1965-09-21 | |
License Status: Re-Entered | |
Spud Date: 1965-09-29 | |
Final Drill Date: 1965-10-19 | |
Well Total Depth: 1920.50 m | |
Surface Hole Latitude: 52.370636 | |
Surface Hole Longitude: -113.337138 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-09-21 | Obtained License |
1965-10-04 | Drill Stem Test Performed |
1965-10-06 | Drill Stem Test Performed |
1965-10-08 | Drill Stem Test Performed |
1965-10-10 | Drill Stem Test Performed |
1965-10-17 | Drill Stem Test Performed |
1965-10-19 | Finished Drilling |
1965-10-19 | Well Mode changed to Drilled and Cased |
1965-10-22 | Production Casing Operation Performed |
1965-10-27 | Perforation Treatment Performed - Jet Perforation |
1965-12-09 | Well Began Production |
1965-12-09 | Well Fluid changed to Crude Oil |
1965-12-09 | Well Mode changed to Pumping |
1966-03-31 | Well Fluid changed to Crude Oil |
1966-03-31 | Well Mode changed to Suspended |
1970-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1970-07-02 | Well Abandoned |
1970-07-02 | Well Fluid changed to Crude Oil |
1970-07-02 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-10-27 | Perforation | 1374.60 | 1377.40 | 13 |
1970-07-02 | Packing Device Capped w/Cement | 1350.60 | 1367.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]