X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242611024

Well Details

Well ID: 0394242611024
Loading map...
Location: 02/11-26-039-24W4/4
Location Alias: 02/11-26-39-24 W4M
Location Alias 2: 02/11-26-039-24 W4/04
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 11-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0108126
License Date: 1984-07-10
License Status: Suspension
Spud Date: 1984-07-25
Final Drill Date: 1996-06-23
Well Total Depth: 2120.00 m
Surface Hole Latitude: 52.388997
Surface Hole Longitude: -113.353084

For data sources see[1][2]

Well History

Date Event
1984-07-10 Obtained License
1996-06-18 Direction Drilling Operation Performed - Horizontal
1996-06-23 Finished Drilling
1996-06-23 Perforation Treatment Performed - Open-Hole Completion
1996-06-23 Well Log Performed
1996-06-23 Well Mode changed to Drilled and Cased
1996-06-24 Liner Casing Operation Performed
1996-06-24 Rig Released
1996-07-10 Well Log Performed
1996-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-10 Perforation Treatment Performed - Jet Perforation
2003-10-10 Plug Back Performed
2003-10-10 Well Log Performed
2003-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-15 Perforation Treatment Performed - Jet Perforation
2003-10-15 Well Log Performed
2003-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-24 Well Began Production
2003-10-24 Well Fluid changed to Crude Oil
2003-10-24 Well Mode changed to Pumping
2006-11-01 Well Fluid changed to Crude Oil
2006-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-18 1761.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-23 Open Hole/Barefoot Completion 1900.00 2120.00 0
1996-07-18 Acid Treatment 1900.00 2120.00 0
2003-10-10 Packing Device Capped w/Cement 1873.30 1881.30 0
2003-10-10 Perforation 1853.00 1856.00 17
2003-10-14 Acid Treatment 1853.00 1856.00 0
2003-10-15 Perforation 1838.00 1844.00 17
2003-10-16 Acid Treatment 1838.00 1844.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 504 0.0 0.0 0.0

For data sources see[6]

References