If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394242615002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.388569,"lon":-113.348345,"icon":""}]} |
Location: 00/15-26-039-24W4/2 | |
Location Alias: 00/15-26-39-24 W4M | |
Location Alias 2: 00/15-26-039-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 26 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 15-26-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0145007 | |
License Date: 1990-08-07 | |
License Status: Suspension | |
Spud Date: 1990-09-02 | |
Final Drill Date: 1990-09-09 | |
Well Total Depth: 1902.00 m | |
Surface Hole Latitude: 52.388569 | |
Surface Hole Longitude: -113.348345 |
Date | Event |
---|---|
1990-08-07 | Obtained License |
1990-09-03 | Surface Casing Operation Performed |
1990-09-09 | Finished Drilling |
1990-09-09 | Well Mode changed to Drilled and Cased |
1990-09-10 | Drill Stem Test Performed |
1990-09-10 | Well Log Performed |
1990-09-12 | Drill Stem Test Performed |
1990-09-13 | Production Casing Operation Performed |
1990-09-13 | Rig Released |
1990-10-02 | Well Log Performed |
1990-10-03 | Well Log Performed |
1990-10-05 | Perforation Treatment Performed - Jet Perforation |
1990-10-05 | Well Log Performed |
1990-10-12 | Perforation Treatment Performed - Cement Squeeze |
1990-10-12 | Well Log Performed |
1990-10-13 | Perforation Treatment Performed - Jet Perforation |
1990-10-16 | Well Log Performed |
1990-10-18 | Perforation Treatment Performed - Jet Perforation |
1990-10-23 | Well Log Performed |
1990-10-24 | Perforation Treatment Performed - Jet Perforation |
1990-11-17 | Well Began Production |
1990-11-17 | Well Fluid changed to Crude Oil |
1990-11-17 | Well Mode changed to Pumping |
1992-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-03-23 | Perforation Treatment Performed - Cement Squeeze |
1995-03-23 | Plug Back Performed |
1995-03-28 | Perforation Treatment Performed - Jet Perforation |
1995-03-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-03-31 | Perforation Treatment Performed - Jet Perforation |
1995-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-02-07 | Perforation Treatment Performed - Cement Squeeze |
1999-02-07 | Plug Back Performed |
1999-02-08 | Perforation Treatment Performed - Jet Perforation |
1999-02-08 | Well Log Performed |
1999-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-06-22 | Plug Back Performed |
2004-06-25 | Perforation Treatment Performed - Cement Squeeze |
2004-06-28 | Perforation Treatment Performed - Jet Perforation |
2004-06-28 | Well Log Performed |
2011-12-31 | Well Fluid changed to Crude Oil |
2011-12-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-10-05 | Perforation | 1871.50 | 1874.50 | 16 |
1995-03-29 | Acid Treatment | 1861.00 | 1863.00 | 0 |
1995-03-31 | Perforation | 1820.00 | 1821.00 | 13 |
1995-04-06 | Acid Treatment | 1820.00 | 1821.00 | 0 |
1999-02-07 | Cement Squeeze | 1861.00 | 1863.00 | 0 |
1999-02-08 | Perforation | 1856.00 | 1859.00 | 13 |
1999-02-09 | Acid Treatment | 1856.00 | 1859.00 | 0 |
2004-06-22 | Packing Device Capped w/Cement | 1840.00 | 1852.00 | 0 |
2004-06-25 | Cement Squeeze | 1820.00 | 1821.00 | 0 |
2004-06-28 | Perforation | 1831.00 | 1834.00 | 17 |
1990-10-12 | Cement Squeeze | 1871.50 | 1874.50 | 0 |
1990-10-13 | Perforation | 1869.50 | 1870.20 | 16 |
1990-10-18 | Perforation | 1865.50 | 1866.50 | 16 |
1990-10-24 | Perforation | 1823.00 | 1825.00 | 16 |
1992-01-25 | Acid Treatment | 1823.00 | 1825.00 | 0 |
1995-03-23 | Acid Treatment | 1865.50 | 1866.50 | 0 |
1995-03-23 | Cement Squeeze | 1823.00 | 1866.50 | 0 |
1995-03-28 | Perforation | 1861.00 | 1863.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 934 | 0.0 | 0.0 | 0.0 |
1991 | 7408 | 0.0 | 0.0 | 0.0 |
1992 | 8144 | 0.0 | 0.0 | 0.0 |
1993 | 7341 | 0.0 | 0.0 | 0.0 |
1994 | 8135 | 0.0 | 0.0 | 0.0 |
1995 | 5858 | 0.0 | 0.0 | 0.0 |
1996 | 8697 | 0.0 | 0.0 | 0.0 |
1997 | 8451 | 0.0 | 0.0 | 0.0 |
1998 | 8705 | 0.0 | 0.0 | 0.0 |
1999 | 3528 | 0.0 | 0.0 | 0.0 |
2000 | 7600 | 0.0 | 0.0 | 0.0 |
2004 | 4272 | 0.0 | 0.0 | 0.0 |
2005 | 7521 | 0.0 | 0.0 | 0.0 |
For data sources see[5]