X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242916000

Well Details

Well ID: 0394242916000
Loading map...
Location: 00/16-29-039-24W4/0
Location Alias: 00/16-29-39-24 W4M
Location Alias 2: 00/16-29-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 29
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 16-29-39-24
Operator Name: Ember Resources Inc.
License Number: 0322312
License Date: 2004-12-20
License Status: Issued
Spud Date: 2005-01-29
Final Drill Date: 2006-04-30
Well Total Depth: 553.00 m
Surface Hole Latitude: 52.387533
Surface Hole Longitude: -113.416216

For data sources see[1][2]

Well History

Date Event
2004-12-20 Obtained License
2005-02-01 Surface Casing Operation Performed
2005-02-02 Well Mode changed to Drilled and Cased
2005-02-03 Perforation Treatment Performed - Open-Hole Completion
2005-02-03 Rig Released
2005-02-03 Well Log Performed
2005-02-26 Well Log Performed
2005-03-24 Well Began Production
2005-03-24 Well Fluid changed to Coalbed Methane-Coals and Other
2005-03-24 Well Mode changed to Flowing
2006-04-30 Finished Drilling
2006-05-01 Production Casing Operation Performed
2006-05-03 Well Log Performed
2006-05-05 Perforation Treatment Performed - Jet Perforation
2006-05-05 Well Log Performed
2006-05-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-03 Open Hole/Barefoot Completion 379.00 535.20 0
2006-05-05 Perforation 480.40 481.50 17
2006-05-05 Perforation 457.60 458.10 17
2006-05-05 Perforation 455.10 456.70 17
2006-05-05 Perforation 440.70 441.50 17
2006-05-05 Perforation 428.90 429.60 17
2006-05-05 Perforation 410.30 410.80 17
2006-05-05 Perforation 405.60 406.60 17
2006-05-05 Perforation 398.00 398.50 17
2006-05-05 Perforation 391.70 392.20 17
2006-05-05 Perforation 389.60 390.10 17
2006-05-05 Perforation 527.80 528.30 17
2006-05-05 Perforation 388.30 389.10 17
2006-05-05 Perforation 384.00 384.70 17
2006-05-05 Perforation 381.90 382.20 17
2006-05-06 Fracture 522.40 528.30 0
2006-05-06 Fracture 516.50 519.70 0
2006-05-06 Fracture 498.30 504.20 0
2006-05-06 Fracture 480.40 485.20 0
2006-05-06 Fracture 455.10 458.10 0
2006-05-06 Fracture 440.70 441.50 0
2006-05-06 Fracture 428.90 429.60 0
2006-05-05 Perforation 522.40 523.20 17
2006-05-06 Fracture 405.60 410.80 0
2006-05-06 Fracture 398.00 398.50 0
2006-05-06 Fracture 388.30 392.20 0
2006-05-06 Fracture 381.90 384.70 0
2006-05-05 Perforation 518.20 519.70 17
2006-05-05 Perforation 516.50 517.60 17
2006-05-05 Perforation 503.30 504.20 17
2006-05-05 Perforation 498.30 498.80 17
2006-05-05 Perforation 484.60 485.20 17
2006-05-05 Perforation 483.20 483.90 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5160 0.0 0.0 0.0
2006 8426 0.0 0.0 0.0
2007 7202 0.0 0.0 0.0
2008 6524 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8647 0.0 0.0 0.0
2011 8471 0.0 0.0 0.0
2012 8311 0.0 0.0 0.0
2013 8262 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8707 0.0 0.0 0.0
2016 8695 0.0 0.0 0.0
2017 8193 0.0 0.0 0.0
2018 2582 0.0 0.0 0.0
2019 1361 0.0 0.0 0.0
2020 1971 0.0 0.0 0.0

For data sources see[5]

References