X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243503000

Well Details

Well ID: 0394243503000
Loading map...
Location: 00/03-35-039-24W4/0
Location Alias: 00/03-35-39-24 W4M
Location Alias 2: 00/03-35-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 3-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0118499
License Date: 1985-10-22
License Status: Suspension
Spud Date: 1985-10-23
Final Drill Date: 1985-11-09
Well Total Depth: 1925.00 m
Surface Hole Latitude: 52.391526
Surface Hole Longitude: -113.354352

For data sources see[1][2]

Well History

Date Event
1985-10-22 Obtained License
1985-10-24 Surface Casing Operation Performed
1985-10-28 Direction Drilling Operation Performed - Deviate
1985-11-08 Lost Circulation Occurred
1985-11-09 Finished Drilling
1985-11-09 Well Log Performed
1985-11-09 Well Mode changed to Drilled and Cased
1985-11-10 Drill Stem Test Performed
1985-11-12 Drill Stem Test Performed
1985-11-14 Production Casing Operation Performed
1985-11-14 Rig Released
1985-12-11 Well Log Performed
1985-12-12 Perforation Treatment Performed - Jet Perforation
1985-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-13 Well Log Performed
1985-12-14 Perforation Treatment Performed - Jet Perforation
1985-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-15 Well Began Production
1986-01-15 Well Fluid changed to Crude Oil
1986-01-15 Well Mode changed to Pumping
1991-02-09 Perforation Treatment Performed - Cement Squeeze
1991-02-12 Perforation Treatment Performed - Cement Squeeze
1991-02-16 Perforation Treatment Performed - Jet Perforation
1991-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-22 Perforation Treatment Performed - Jet Perforation
1996-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-23 Perforation Treatment Performed - Cement Squeeze
1996-08-23 Plug Back Performed
1996-08-26 Perforation Treatment Performed - Jet Perforation
1996-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-05 Well Fluid changed to Crude Oil
1997-09-05 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-10-28 1388.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-12 Perforation 1879.50 1880.50 14
1996-08-23 Acid Treatment 1875.00 1877.00 0
1996-08-23 Cement Squeeze 1835.50 1877.00 0
1996-08-26 Perforation 1869.50 1871.50 13
1996-08-27 Acid Treatment 1869.50 1871.50 0
1985-12-13 Acid Treatment 1879.50 1880.50 0
1985-12-14 Perforation 1845.50 1846.50 14
1985-12-15 Acid Treatment 1845.50 1846.50 0
1991-02-09 Cement Squeeze 1879.50 1880.50 0
1991-02-12 Cement Squeeze 1845.50 1846.50 0
1991-02-16 Perforation 1875.00 1877.00 16
1991-02-20 Acid Treatment 1875.00 1877.00 0
1991-02-22 Perforation 1835.50 1838.00 16

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 7908 0.0 0.0 0.0
1987 8452 0.0 0.0 0.0
1988 8603 0.0 0.0 0.0
1989 8054 0.0 0.0 0.0
1990 8538 0.0 0.0 0.0
1991 7289 0.0 0.0 0.0
1992 8386 0.0 0.0 0.0
1993 8157 0.0 0.0 0.0
1994 8726 0.0 0.0 0.0
1995 8287 0.0 0.0 0.0
1996 7461 0.0 0.0 0.0
1997 4467 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-11-08 Lost Circulation 1882.00 1882.00

For data sources see[7]

References