If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394243509002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.399595,"lon":-113.342803,"icon":""}]} |
Location: 00/09-35-039-24W4/2 | |
Location Alias: 00/09-35-39-24 W4M | |
Location Alias 2: 00/09-35-039-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 9-35-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0120062 | |
License Date: 1985-12-05 | |
License Status: Suspension | |
Spud Date: 1986-01-17 | |
Final Drill Date: 1986-01-30 | |
Well Total Depth: 1922.00 m | |
Surface Hole Latitude: 52.399595 | |
Surface Hole Longitude: -113.342803 |
Date | Event |
---|---|
1985-12-05 | Obtained License |
1986-01-18 | Surface Casing Operation Performed |
1986-01-30 | Finished Drilling |
1986-01-30 | Well Mode changed to Drilled and Cased |
1986-01-31 | Well Log Performed |
1986-02-01 | Production Casing Operation Performed |
1986-02-01 | Rig Released |
1986-02-22 | Well Log Performed |
1986-02-23 | Perforation Treatment Performed - Jet Perforation |
1986-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-24 | Well Log Performed |
1986-02-25 | Perforation Treatment Performed - Jet Perforation |
1986-02-25 | Well Log Performed |
1986-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-05-10 | Well Began Production |
1986-05-10 | Well Fluid changed to Crude Oil |
1986-05-10 | Well Mode changed to Pumping |
1994-10-01 | Well Fluid changed to Crude Oil |
1994-10-01 | Well Mode changed to Pumping |
1994-10-03 | Well Log Performed |
1994-10-04 | Perforation Treatment Performed - Cement Squeeze |
1994-10-06 | Perforation Treatment Performed - Jet Perforation |
1994-10-06 | Well Log Performed |
1994-10-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-13 | Perforation Treatment Performed - Jet Perforation |
1994-10-13 | Well Fluid changed to Crude Oil |
1994-10-13 | Well Log Performed |
1994-10-13 | Well Mode changed to Pumping |
1994-10-17 | Perforation Treatment Performed - Jet Perforation |
1994-10-17 | Well Log Performed |
1994-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-01 | Well Log Performed |
1999-06-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-02 | Perforation Treatment Performed - Cement Squeeze |
1999-06-03 | Perforation Treatment Performed - Jet Perforation |
1999-06-03 | Well Log Performed |
1999-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-11-01 | Well Fluid changed to Crude Oil |
2006-11-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-02-23 | Perforation | 1881.00 | 1882.00 | 13 |
1994-10-13 | Packing Device Capped w/Cement | 1863.00 | 1870.00 | 0 |
1994-10-13 | Perforation | 1845.50 | 1846.50 | 18 |
1994-10-17 | Perforation | 1836.00 | 1839.00 | 18 |
1994-10-18 | Acid Treatment | 1836.00 | 1839.00 | 0 |
1999-06-02 | Acid Treatment | 1845.50 | 1846.50 | 0 |
1999-06-02 | Cement Squeeze | 1845.50 | 1846.50 | 0 |
1999-06-03 | Perforation | 1836.00 | 1841.00 | 13 |
1999-06-04 | Acid Treatment | 1836.00 | 1841.00 | 0 |
1986-02-24 | Acid Treatment | 1881.00 | 1882.00 | 0 |
1986-02-25 | Perforation | 1847.50 | 1848.00 | 7 |
1986-02-26 | Acid Treatment | 1847.50 | 1848.00 | 0 |
1994-10-04 | Cement Squeeze | 1881.00 | 1882.00 | 0 |
1994-10-04 | Cement Squeeze | 1847.50 | 1848.00 | 0 |
1994-10-06 | Perforation | 1873.00 | 1875.00 | 18 |
1994-10-06 | Perforation | 1876.00 | 1877.50 | 18 |
1994-10-11 | Acid Treatment | 1873.00 | 1877.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 5288 | 0.0 | 0.0 | 0.0 |
1987 | 8428 | 0.0 | 0.0 | 0.0 |
1988 | 8585 | 0.0 | 0.0 | 0.0 |
1989 | 8359 | 0.0 | 0.0 | 0.0 |
1990 | 8265 | 0.0 | 0.0 | 0.0 |
1991 | 8295 | 0.0 | 0.0 | 0.0 |
1992 | 8289 | 0.0 | 0.0 | 0.0 |
1993 | 8341 | 0.0 | 0.0 | 0.0 |
1994 | 7881 | 0.0 | 0.0 | 0.0 |
1995 | 8348 | 0.0 | 0.0 | 0.0 |
1996 | 8171 | 0.0 | 0.0 | 0.0 |
1997 | 8000 | 0.0 | 0.0 | 0.0 |
1998 | 8711 | 0.0 | 0.0 | 0.0 |
1999 | 8252 | 0.0 | 0.0 | 0.0 |
2000 | 8706 | 0.0 | 0.0 | 0.0 |
2001 | 8529 | 0.0 | 0.0 | 0.0 |
2002 | 8388 | 0.0 | 0.0 | 0.0 |
2003 | 8641 | 0.0 | 0.0 | 0.0 |
2004 | 7439 | 0.0 | 0.0 | 0.0 |
For data sources see[5]