If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394243516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.403417,"lon":-113.342065,"icon":""}]} |
Location: 00/16-35-039-24W4/0 | |
Location Alias: 00/16-35-39-24 W4M | |
Location Alias 2: 00/16-35-039-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 16-35-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0107637 | |
License Date: 1984-06-14 | |
License Status: Suspension | |
Spud Date: 1984-06-18 | |
Final Drill Date: 1984-06-30 | |
Well Total Depth: 1940.00 m | |
Surface Hole Latitude: 52.403417 | |
Surface Hole Longitude: -113.342065 |
Date | Event |
---|---|
1984-06-14 | Obtained License |
1984-06-19 | Surface Casing Operation Performed |
1984-06-30 | Finished Drilling |
1984-06-30 | Well Log Performed |
1984-06-30 | Well Mode changed to Drilled and Cased |
1984-07-02 | Production Casing Operation Performed |
1984-07-02 | Rig Released |
1984-07-26 | Perforation Treatment Performed - Jet Perforation |
1984-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-07-30 | Well Log Performed |
1984-08-01 | Perforation Treatment Performed - Cement Squeeze |
1984-08-01 | Well Log Performed |
1984-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-08-02 | Perforation Treatment Performed - Jet Perforation |
1984-08-03 | Perforation Treatment Performed - Jet Perforation |
1984-08-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-09-26 | Well Began Production |
1984-09-26 | Well Fluid changed to Crude Oil |
1984-09-26 | Well Mode changed to Pumping |
1990-03-03 | Perforation Treatment Performed - Cement Squeeze |
1990-03-06 | Perforation Treatment Performed - Jet Perforation |
1990-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-12 | Perforation Treatment Performed - Jet Perforation |
1990-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-06-17 | Perforation Treatment Performed - Cement Squeeze |
1992-06-18 | Perforation Treatment Performed - Jet Perforation |
2002-08-13 | Perforation Treatment Performed - Cement Squeeze |
2002-08-14 | Perforation Treatment Performed - Jet Perforation |
2002-08-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-12-31 | Well Fluid changed to Crude Oil |
2011-12-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-07-26 | Perforation | 1906.00 | 1907.00 | 14 |
1990-03-06 | Perforation | 1894.50 | 1895.50 | 13 |
1990-03-07 | Acid Treatment | 1894.50 | 1895.50 | 0 |
1990-03-12 | Perforation | 1855.00 | 1856.00 | 13 |
1990-03-13 | Acid Treatment | 1855.00 | 1856.00 | 0 |
1992-06-17 | Cement Squeeze | 1894.50 | 1895.50 | 0 |
1992-06-18 | Perforation | 1888.50 | 1890.50 | 16 |
2002-08-13 | Cement Squeeze | 1855.00 | 1856.00 | 0 |
2002-08-14 | Perforation | 1850.00 | 1853.50 | 17 |
2002-08-15 | Acid Treatment | 1850.50 | 1853.50 | 0 |
1984-07-27 | Acid Treatment | 1906.00 | 1907.00 | 0 |
1984-08-01 | Cement Squeeze | 1906.00 | 1907.00 | 0 |
1984-08-02 | Perforation | 1899.20 | 1900.20 | 14 |
1984-08-02 | Acid Treatment | 1899.20 | 1900.20 | 0 |
1984-08-03 | Perforation | 1862.50 | 1863.00 | 7 |
1984-08-04 | Acid Treatment | 1862.50 | 1863.00 | 0 |
1990-03-03 | Cement Squeeze | 1899.20 | 1900.20 | 0 |
1990-03-03 | Cement Squeeze | 1862.50 | 1863.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 2389 | 0.0 | 0.0 | 0.0 |
1985 | 8562 | 0.0 | 0.0 | 0.0 |
1986 | 8102 | 0.0 | 0.0 | 0.0 |
1987 | 8448 | 0.0 | 0.0 | 0.0 |
1988 | 8621 | 0.0 | 0.0 | 0.0 |
1989 | 8278 | 0.0 | 0.0 | 0.0 |
1990 | 8041 | 0.0 | 0.0 | 0.0 |
1991 | 7507 | 0.0 | 0.0 | 0.0 |
1992 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]