If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394251116002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.346007,"lon":-113.487788,"icon":""}]} |
Location: 00/16-11-039-25W4/2 | |
Location Alias: 00/16-11-39-25 W4M | |
Location Alias 2: 00/16-11-039-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 11 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES JOFFRE 16-11-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0339654 | |
License Date: 2005-10-08 | |
License Status: Issued | |
Spud Date: 2005-10-23 | |
Final Drill Date: 2005-10-24 | |
Well Total Depth: 914.00 m | |
Surface Hole Latitude: 52.346007 | |
Surface Hole Longitude: -113.487788 |
Date | Event |
---|---|
2005-10-08 | Obtained License |
2005-10-21 | Surface Casing Operation Performed |
2005-10-24 | Finished Drilling |
2005-10-24 | Production Casing Operation Performed |
2005-10-24 | Rig Released |
2005-10-24 | Well Mode changed to Drilled and Cased |
2005-10-30 | Well Log Performed |
2005-12-01 | Perforation Treatment Performed - Jet Perforation |
2005-12-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-12-09 | Well Mode changed to Testing |
2006-01-06 | Perforation Treatment Performed - Jet Perforation |
2006-01-10 | Perforation Treatment Performed - Fractured |
2006-01-17 | Well Began Production |
2006-01-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-01-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-12-01 | Perforation | 868.30 | 870.30 | 13 |
2006-01-06 | Perforation | 547.90 | 548.40 | 13 |
2006-01-06 | Perforation | 545.70 | 546.20 | 13 |
2006-01-06 | Perforation | 530.40 | 530.90 | 13 |
2006-01-06 | Perforation | 523.60 | 524.10 | 13 |
2006-01-06 | Perforation | 521.00 | 521.50 | 13 |
2006-01-06 | Perforation | 504.30 | 506.30 | 13 |
2006-01-06 | Perforation | 481.70 | 482.20 | 13 |
2006-01-06 | Perforation | 455.40 | 455.90 | 13 |
2006-01-06 | Perforation | 442.00 | 444.00 | 13 |
2006-01-06 | Perforation | 434.10 | 434.60 | 13 |
2005-12-01 | Perforation | 810.20 | 811.70 | 13 |
2006-01-06 | Perforation | 423.20 | 423.70 | 13 |
2006-01-06 | Perforation | 392.00 | 393.00 | 13 |
2006-01-06 | Perforation | 386.40 | 386.90 | 13 |
2006-01-06 | Perforation | 370.50 | 372.50 | 13 |
2006-01-06 | Perforation | 332.40 | 333.90 | 13 |
2006-01-06 | Perforation | 303.70 | 304.70 | 13 |
2006-01-06 | Perforation | 279.00 | 281.00 | 13 |
2006-01-06 | Perforation | 242.00 | 243.00 | 13 |
2006-01-06 | Perforation | 233.00 | 234.00 | 13 |
2006-01-06 | Perforation | 218.80 | 219.80 | 13 |
2006-01-06 | Perforation | 631.10 | 633.60 | 13 |
2006-01-06 | Perforation | 211.00 | 212.50 | 13 |
2006-01-06 | Perforation | 208.00 | 208.50 | 13 |
2006-01-06 | Perforation | 203.40 | 204.40 | 13 |
2006-01-10 | Fracture | 203.40 | 633.60 | 0 |
2006-01-06 | Perforation | 625.00 | 628.00 | 13 |
2006-01-06 | Perforation | 613.90 | 615.90 | 13 |
2006-01-06 | Perforation | 567.10 | 567.60 | 13 |
2006-01-06 | Perforation | 565.80 | 566.30 | 13 |
2006-01-06 | Perforation | 564.30 | 565.30 | 13 |
2006-01-06 | Perforation | 560.10 | 561.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 72 | 0.0 | 0.0 | 0.0 |
2006 | 8338 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8753 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]