X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394252202000

Well Details

Well ID: 0394252202000
Loading map...
Location: 00/02-22-039-25W4/0
Location Alias: 00/02-22-39-25 W4M
Location Alias 2: 00/02-22-039-25 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 25
Section: 22
County/Municipality: Lacombe County
Well Name: CPC RESOURCES JOFFRE 2-22-39-25
Operator Name: Lynx Energy ULC
License Number: 0339651
License Date: 2005-10-08
License Status: Issued
Spud Date: 2005-10-27
Final Drill Date: 2005-10-28
Well Total Depth: 964.00 m
Surface Hole Latitude: 52.363112
Surface Hole Longitude: -113.518544

For data sources see[1][2]

Well History

Date Event
2005-10-08 Obtained License
2005-10-22 Surface Casing Operation Performed
2005-10-28 Finished Drilling
2005-10-28 Production Casing Operation Performed
2005-10-28 Rig Released
2005-10-28 Well Mode changed to Drilled and Cased
2005-11-21 Well Log Performed
2005-12-20 Perforation Treatment Performed - Jet Perforation
2005-12-22 Well Began Production
2005-12-22 Well Fluid changed to Gas
2005-12-22 Well Mode changed to Flowing
2007-09-30 Perforation Treatment Performed - Jet Perforation
2007-10-17 Perforation Treatment Performed - Jet Perforation
2007-10-21 Perforation Treatment Performed - Fractured
2007-12-01 Well Fluid changed to Gas
2007-12-01 Well Mode changed to Suspended
2009-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-01 Plug Back Performed
2009-11-01 Well Fluid changed to Gas
2009-11-01 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-20 Perforation 907.00 908.50 13
2007-10-17 Perforation 586.40 587.40 7
2007-10-17 Perforation 584.10 585.10 7
2007-10-17 Perforation 569.70 570.70 7
2007-10-17 Perforation 562.00 563.00 7
2007-10-17 Perforation 550.20 552.20 7
2007-10-17 Perforation 537.00 538.00 7
2007-10-17 Perforation 519.00 520.20 7
2007-10-17 Perforation 502.40 503.40 7
2007-10-17 Perforation 484.80 486.30 7
2007-10-17 Perforation 468.00 469.00 7
2007-09-30 Perforation 855.00 857.00 13
2007-10-17 Perforation 417.10 418.60 7
2007-10-17 Perforation 385.40 386.40 7
2007-10-17 Perforation 263.70 264.70 7
2007-10-17 Perforation 248.30 253.30 7
2007-10-17 Perforation 243.00 244.00 7
2007-10-21 Fracture 243.00 622.40 0
2009-11-01 Packing Device Capped w/Cement 895.00 903.00 0
2009-11-01 Packing Device Capped w/Cement 845.00 853.00 0
2007-10-17 Perforation 621.40 622.40 7
2007-10-17 Perforation 617.50 618.50 7
2007-10-17 Perforation 616.00 617.00 7
2007-10-17 Perforation 608.10 609.10 7
2007-10-17 Perforation 604.40 606.90 7
2007-10-17 Perforation 598.80 600.30 7
2007-10-17 Perforation 592.00 593.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 179 0.0 0.0 0.0
2006 5476 0.0 0.0 0.0
2007 4224 0.0 0.0 0.0

For data sources see[5]

References