X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394252216020

Well Details

Well ID: 0394252216020
Loading map...
Location: 02/16-22-039-25W4/0
Location Alias: 02/16-22-39-25 W4M
Location Alias 2: 02/16-22-039-25 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 25
Section: 22
County/Municipality: Lacombe County
Well Name: CPC RESOURCES JOFFRE 16-22-39-25
Operator Name: Lynx Energy ULC
License Number: 0319294
License Date: 2004-11-19
License Status: Issued
Spud Date: 2005-01-24
Final Drill Date: 2005-01-25
Well Total Depth: 646.00 m
Surface Hole Latitude: 52.373348
Surface Hole Longitude: -113.508892

For data sources see[1][2]

Well History

Date Event
2004-11-19 Obtained License
2005-01-21 Surface Casing Operation Performed
2005-01-24 Production Casing Operation Performed
2005-01-25 Finished Drilling
2005-01-25 Rig Released
2005-01-25 Well Mode changed to Drilled and Cased
2005-02-01 Well Log Performed
2005-02-08 Perforation Treatment Performed - Jet Perforation
2005-02-21 Perforation Treatment Performed - Fractured
2005-02-21 Well Fluid changed to Coalbed Methane-Coals and Other
2005-02-21 Well Mode changed to Testing
2005-03-23 Well Began Production
2005-03-23 Well Fluid changed to Coalbed Methane-Coals and Other
2005-03-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-08 Perforation 592.30 593.30 13
2005-02-08 Perforation 501.40 502.40 13
2005-02-08 Perforation 497.10 498.10 13
2005-02-08 Perforation 488.70 489.70 13
2005-02-08 Perforation 485.80 486.80 13
2005-02-08 Perforation 475.30 476.30 13
2005-02-08 Perforation 457.40 460.40 13
2005-02-08 Perforation 449.60 450.60 13
2005-02-08 Perforation 413.00 415.00 13
2005-02-08 Perforation 392.80 393.80 13
2005-02-08 Perforation 390.10 391.10 13
2005-02-08 Perforation 583.00 584.00 13
2005-02-08 Perforation 380.70 381.70 13
2005-02-08 Perforation 369.50 371.50 13
2005-02-08 Perforation 241.20 243.20 13
2005-02-08 Perforation 237.40 238.40 13
2005-02-08 Perforation 235.40 236.40 13
2005-02-08 Perforation 232.30 233.30 13
2005-02-08 Perforation 227.60 228.60 13
2005-02-08 Perforation 222.80 225.80 13
2005-02-08 Perforation 215.00 216.00 13
2005-02-21 Fracture 215.00 593.30 0
2005-02-08 Perforation 580.30 581.30 13
2005-02-08 Perforation 577.50 579.50 13
2005-02-08 Perforation 571.00 573.00 13
2005-02-08 Perforation 560.30 561.30 13
2005-02-08 Perforation 540.30 541.30 13
2005-02-08 Perforation 522.40 524.40 13
2005-02-08 Perforation 505.60 506.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 6900 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8669 0.0 0.0 0.0
2010 8698 0.0 0.0 0.0
2011 8628 0.0 0.0 0.0
2012 8726 0.0 0.0 0.0
2013 8713 0.0 0.0 0.0
2014 8749 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8757 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References