X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394260411022

Well Details

Well ID: 0394260411022
Loading map...
Location: 02/11-04-039-26W4/2
Location Alias: 02/11-04-39-26 W4M
Location Alias 2: 02/11-04-039-26 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 04
County/Municipality: Lacombe County
Well Name: CNRL VIKING JOFFRE 11-4-39-26
Operator Name: Canadian Natural Resources Limited
License Number: 0015212
License Date: 1958-05-15
License Status: RecCertified
Spud Date: 1958-05-18
Final Drill Date: 1958-06-19
Well Total Depth: 2084.20 m
Surface Hole Latitude: 52.326612
Surface Hole Longitude: -113.690579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-05-15 Obtained License
1958-05-30 Lost Circulation Occurred
1958-06-03 Drill Stem Test Performed
1958-06-04 Drill Stem Test Performed
1958-06-05 Drill Stem Test Performed
1958-06-19 Finished Drilling
1958-06-20 Production Casing Operation Performed
1958-06-23 Perforation Treatment Performed - Jet Perforation
1958-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-29 Perforation Treatment Performed - Jet Perforation
1976-12-03 Perforation Treatment Performed - Jet Perforation
1976-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-05 Perforation Treatment Performed - Cement Plug
1983-02-16 Perforation Treatment Performed - Jet Perforation
1983-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-25 Perforation Treatment Performed - Jet Perforation
1983-05-26 Perforation Treatment Performed - Cement Squeeze
1983-06-04 Perforation Treatment Performed - Jet Perforation
1983-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-28 Perforation Treatment Performed - Cement Plug
1995-08-28 Perforation Treatment Performed - Cement Squeeze
1995-08-28 Plug Back Performed
1995-08-28 Well Log Performed
1995-08-29 Perforation Treatment Performed - Jet Perforation
1995-08-29 Well Mode changed to Drilled and Cased
1995-08-30 Perforation Treatment Performed - Jet Perforation
1995-12-06 Well Began Production
1995-12-06 Well Fluid changed to Gas
1995-12-06 Well Mode changed to Flowing
1996-03-11 Perforation Treatment Performed - Jet Perforation
2006-04-30 Well Fluid changed to Gas
2006-04-30 Well Mode changed to Suspended
2009-08-21 Perforation Treatment Performed - Cement Plug
2009-08-21 Perforation Treatment Performed - Cement Squeeze
2009-08-21 Plug Back Performed
2009-08-21 Well Fluid changed to Gas
2009-08-21 Well Mode changed to Abandoned Zone
2009-08-22 Perforation Treatment Performed - Cement Plug
2009-08-22 Perforation Treatment Performed - Jet Perforation
2009-08-22 Perforation Treatment Performed - Remedial Casing
2009-08-22 Well Log Performed
2009-08-24 Perforation Treatment Performed - Cement Plug
2009-08-24 Perforation Treatment Performed - Jet Perforation
2009-08-24 Perforation Treatment Performed - Remedial Casing
2009-08-24 Well Log Performed
2009-08-25 Well Abandoned
2009-08-25 Well Fluid changed to Gas
2009-08-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-06-23 Perforation 2067.20 2068.70 13
1976-12-05 Acid Treatment 2058.00 2070.20 0
1977-04-11 Acid Treatment 2058.00 2070.20 0
1982-12-05 Cement Plug 2056.50 2084.20 0
1983-02-16 Perforation 2034.50 2039.10 13
1983-02-16 Perforation 2045.80 2047.30 13
1983-02-16 Perforation 2048.80 2054.60 13
1983-02-17 Acid Treatment 2034.50 2054.60 0
1983-05-25 Perforation 2058.00 2063.50 0
1983-05-25 Perforation 2067.20 2071.10 0
1983-05-26 Cement Squeeze 2034.50 2071.10 0
1958-08-10 Acid Treatment 2067.20 2068.70 0
1983-06-04 Perforation 2069.60 2075.60 13
1983-06-05 Acid Treatment 2069.60 2075.60 0
1995-08-28 Cement Squeeze 2069.60 2075.60 0
1995-08-28 Cement Plug 1852.00 2075.60 0
1995-08-29 Perforation 1694.10 1695.90 13
1995-08-30 Perforation 1691.00 1693.00 13
1996-03-11 Perforation 1700.00 1703.00 13
2009-08-21 Cement Squeeze 1691.00 1703.00 0
2009-08-21 Cement Plug 1556.00 1720.00 0
2009-08-22 Perforation 1508.00 1509.00 13
1976-01-29 Perforation 2059.80 2061.10 7
2009-08-22 Remedial Casing Cementing 1508.00 1509.00 0
2009-08-22 Cement Plug 1139.00 1509.00 0
2009-08-24 Perforation 230.00 231.00 14
2009-08-24 Remedial Casing Cementing 230.00 231.00 0
2009-08-24 Cement Plug 50.00 231.00 0
1976-01-29 Perforation 2062.00 2063.50 7
1976-01-29 Perforation 2070.20 2071.10 7
1976-01-29 Acid Treatment 2059.80 2071.10 0
1976-12-03 Perforation 2058.00 2059.80 7
1976-12-03 Perforation 2061.10 2062.00 7
1976-12-03 Perforation 2068.40 2070.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 338 0.0 0.0 0.0
1996 5625 0.0 0.0 0.0
1997 8363 0.0 0.0 0.0
1998 8689 0.0 0.0 0.0
1999 8720 0.0 0.0 0.0
2000 8633 0.0 0.0 0.0
2001 7633 0.0 0.0 0.0
2002 8273 0.0 0.0 0.0
2003 8336 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 3482 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-05-30 Lost Circulation 1632.80 1632.80

For data sources see[6]

References