X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394261503000

Well Details

Well ID: 0394261503000
Loading map...
Location: 00/03-15-039-26W4/0
Location Alias: 00/03-15-39-26 W4M
Location Alias 2: 00/03-15-039-26 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 15
County/Municipality: Lacombe County
Well Name: NALR D2A UNIT JOFFRE 3-15-39-26
Operator Name: NAL Resources Limited
License Number: 0014534
License Date: 1958-01-06
License Status: RecCertified
Spud Date: 1958-01-07
Final Drill Date: 1958-01-29
Well Total Depth: 2121.40 m
Surface Hole Latitude: 52.348296
Surface Hole Longitude: -113.666171

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-01-06 Obtained License
1958-01-29 Finished Drilling
1958-01-29 Well Mode changed to Drilled and Cased
1958-01-30 Drill Stem Test Performed
1958-01-31 Production Casing Operation Performed
1958-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-02 Perforation Treatment Performed - Jet Perforation
1958-02-06 Well Began Production
1958-02-06 Well Fluid changed to Crude Oil
1958-02-06 Well Mode changed to Flowing
1974-11-25 Well Began Injection
1974-11-25 Well Fluid changed to Water
1974-11-25 Well Type changed to Injection
1989-02-28 Well Log Performed
1992-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-02 Perforation Treatment Performed - Jet Perforation
1992-07-02 Perforation Treatment Performed - Remedial Casing
1992-07-02 Plug Back Performed
1992-07-02 Well Fluid changed to Water
1992-07-02 Well Log Performed
1992-07-02 Well Mode changed to Abandoned
1992-07-02 Well Type changed to Injection
1992-09-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-02-02 Perforation 2075.10 2083.30 13
1958-02-02 Perforation 2087.00 2095.80 13
1958-02-02 Perforation 2099.50 2105.30 13
1958-02-02 Acid Treatment 2075.10 2105.30 0
1992-07-02 Packing Device Capped w/Cement 2054.20 2062.20 0
1992-07-02 Packing Device Capped w/Cement 484.60 492.60 0
1992-07-02 Perforation 203.50 204.00 13
1992-07-02 Remedial Casing Cementing 203.50 204.00 0
1992-07-02 Packing Device Capped w/Cement 188.70 196.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 741 0.0 0.0 0.0
1969 3321 0.0 0.0 0.0
1972 2262 0.0 0.0 0.0
1973 1669 0.0 0.0 0.0
1974 291 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References