If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394272401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.362368,"lon":-113.749931,"icon":""}]} |
Location: 00/01-24-039-27W4/0 | |
Location Alias: 00/01-24-39-27 W4M | |
Location Alias 2: 00/01-24-039-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 27 | |
Section: 24 | |
County/Municipality: Lacombe County | |
Well Name: BAYSEL APCO JOFFRE 1-24N-39-27 | |
Operator Name: Suncor Energy Inc. | |
License Number: 0016209 | |
License Date: 1958-11-10 | |
License Status: RecCertified | |
Spud Date: 1958-11-22 | |
Final Drill Date: 1958-12-15 | |
Well Total Depth: 2156.50 m | |
Surface Hole Latitude: 52.362368 | |
Surface Hole Longitude: -113.749931 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-11-10 | Obtained License |
1958-12-15 | Finished Drilling |
1958-12-15 | Well Mode changed to Drilled and Cased |
1958-12-16 | Production Casing Operation Performed |
1958-12-21 | Perforation Treatment Performed - Jet Perforation |
1958-12-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-01-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-07 | Perforation Treatment Performed - Bullet Perforation |
1959-02-23 | Well Began Production |
1959-02-23 | Well Fluid changed to Crude Oil |
1959-02-23 | Well Mode changed to Pumping |
1959-07-18 | Perforation Treatment Performed - Fractured |
1960-08-17 | Well Fluid changed to Crude Oil |
1960-08-17 | Well Mode changed to Suspended |
1971-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1971-09-10 | Well Abandoned |
1971-09-10 | Well Fluid changed to Crude Oil |
1971-09-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-12-21 | Perforation | 2116.50 | 2121.40 | 13 |
1958-12-21 | Perforation | 2123.80 | 2128.10 | 13 |
1958-12-23 | Acid Treatment | 2116.50 | 2128.10 | 0 |
1959-01-08 | Acid Treatment | 2116.50 | 2128.10 | 0 |
1959-02-07 | Bullet Perforation | 2116.50 | 2121.40 | 13 |
1959-02-07 | Bullet Perforation | 2123.80 | 2128.10 | 13 |
1959-02-07 | Acid Treatment | 2116.50 | 2128.10 | 0 |
1959-07-18 | Fracture | 2116.50 | 2128.10 | 0 |
1971-09-10 | Packing Device Capped w/Cement | 2111.70 | 2111.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]