If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395013207020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.397306,"lon":-114.108706,"icon":""}]} |
Location: 02/07-32-039-01W5/0 | |
Location Alias: 02/07-32-39-01 W5M | |
Location Alias 2: 02/07-32-039-01 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 01 | |
Section: 32 | |
County/Municipality: Lacombe County | |
Well Name: NAL PREVO 7-32-39-1 | |
Operator Name: NAL Resources Limited | |
License Number: 0339003 | |
License Date: 2005-09-30 | |
License Status: Suspension | |
Spud Date: 2005-10-19 | |
Final Drill Date: 2005-10-20 | |
Well Total Depth: 508.00 m | |
Surface Hole Latitude: 52.397306 | |
Surface Hole Longitude: -114.108706 |
Date | Event |
---|---|
2005-09-30 | Obtained License |
2005-10-17 | Surface Casing Operation Performed |
2005-10-19 | Well Log Performed |
2005-10-20 | Finished Drilling |
2005-10-20 | Production Casing Operation Performed |
2005-10-20 | Rig Released |
2005-10-20 | Well Mode changed to Drilled and Cased |
2005-10-29 | Perforation Treatment Performed - Jet Perforation |
2005-10-30 | Perforation Treatment Performed - Fractured |
2005-10-31 | Perforation Treatment Performed - Jet Perforation |
2005-11-01 | Perforation Treatment Performed - Fractured |
2005-12-13 | Well Began Production |
2005-12-13 | Well Fluid changed to Gas |
2005-12-13 | Well Mode changed to Flowing |
2019-02-01 | Well Fluid changed to Gas |
2019-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-10-29 | Perforation | 417.00 | 426.00 | 17 |
2005-10-30 | Fracture | 417.00 | 426.00 | 0 |
2005-10-31 | Perforation | 391.00 | 393.00 | 17 |
2005-11-01 | Fracture | 391.00 | 393.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 452 | 0.0 | 0.0 | 0.0 |
2006 | 8577 | 0.0 | 0.0 | 0.0 |
2007 | 8508 | 0.0 | 0.0 | 0.0 |
2008 | 8617 | 0.0 | 0.0 | 0.0 |
2009 | 8622 | 0.0 | 0.0 | 0.0 |
2010 | 8730 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 8682 | 0.0 | 0.0 | 0.0 |
2013 | 8752 | 0.0 | 0.0 | 0.0 |
2014 | 7934 | 0.0 | 0.0 | 0.0 |
2015 | 8547 | 0.0 | 0.0 | 0.0 |
2016 | 2198 | 0.0 | 0.0 | 0.0 |
For data sources see[5]