If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395030606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.324978,"lon":-114.42226,"icon":""}]} |
Location: 00/06-06-039-03W5/0 | |
Location Alias: 00/06-06-39-03 W5M | |
Location Alias 2: 00/06-06-039-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 06 | |
County/Municipality: Lacombe County | |
Well Name: CALPINE MEDR 6-6-39-3 | |
Operator Name: Calpine Canada Resources Company | |
License Number: 0101749 | |
License Date: 1983-06-15 | |
License Status: RecCertified | |
Spud Date: 1983-06-17 | |
Final Drill Date: 1983-06-28 | |
Well Total Depth: 2251.00 m | |
Surface Hole Latitude: 52.324978 | |
Surface Hole Longitude: -114.422260 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-06-15 | Obtained License |
1983-06-28 | Finished Drilling |
1983-06-28 | Well Log Performed |
1983-06-28 | Well Mode changed to Drilled and Cased |
1983-06-30 | Production Casing Operation Performed |
1983-08-04 | Perforation Treatment Performed - Jet Perforation |
1983-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-05 | Well Began Production |
1983-09-05 | Well Fluid changed to Crude Oil |
1983-09-05 | Well Mode changed to Flowing |
1983-10-08 | Perforation Treatment Performed - Jet Perforation |
1983-10-08 | Well Fluid changed to Crude Oil |
1983-10-08 | Well Mode changed to Flowing |
1983-10-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-02-07 | Well Fluid changed to Crude Oil |
1984-02-07 | Well Mode changed to Suspended |
1985-07-04 | Well Fluid changed to Crude Oil |
1985-07-04 | Well Mode changed to Pumping |
1987-12-01 | Well Fluid changed to Crude Oil |
1987-12-01 | Well Mode changed to Suspended |
1996-11-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-11-15 | Perforation Treatment Performed - Jet Perforation |
1996-11-15 | Plug Back Performed |
1996-11-15 | Well Fluid changed to Crude Oil |
1996-11-15 | Well Mode changed to Abandoned Zone |
1996-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-11-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-08-04 | Perforation | 2188.00 | 2190.00 | 13 |
1983-08-05 | Acid Treatment | 2188.00 | 2190.00 | 0 |
1983-10-08 | Perforation | 2163.50 | 2169.00 | 13 |
1983-10-11 | Acid Treatment | 2163.50 | 2169.00 | 0 |
1996-11-15 | Packing Device Capped w/Cement | 2142.00 | 2150.00 | 0 |
1996-11-15 | Perforation | 345.50 | 346.00 | 13 |
1996-11-16 | Packing Device Capped w/Cement | 205.00 | 351.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 456 | 0.0 | 0.0 | 0.0 |
1984 | 124 | 0.0 | 0.0 | 0.0 |
1985 | 4038 | 0.0 | 0.0 | 0.0 |
1986 | 2711 | 0.0 | 0.0 | 0.0 |
1987 | 5010 | 0.0 | 0.0 | 0.0 |
For data sources see[5]