X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032106002

Well Details

Well ID: 0395032106002
Loading map...
Location: 00/06-21-039-03W5/2
Location Alias: 00/06-21-39-03 W5M
Location Alias 2: 00/06-21-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 6-21-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0020528
License Date: 1961-03-07
License Status: RecCertified
Spud Date: 1961-03-27
Final Drill Date: 1961-04-19
Well Total Depth: 2198.50 m
Surface Hole Latitude: 52.368457
Surface Hole Longitude: -114.376413

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-07 Obtained License
1961-04-14 Drill Stem Test Performed
1961-04-19 Finished Drilling
1961-04-19 Well Mode changed to Drilled and Cased
1961-04-21 Production Casing Operation Performed
1961-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-04-24 Perforation Treatment Performed - Jet Perforation
1961-09-05 Perforation Treatment Performed - Cement Squeeze
1961-09-08 Perforation Treatment Performed - Jet Perforation
1961-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-07 Perforation Treatment Performed - Jet Perforation
1962-02-08 Perforation Treatment Performed - Acid Wash - No Pressure
1963-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-12 Perforation Treatment Performed - Jet Perforation
1963-08-14 Perforation Treatment Performed - Cement Squeeze
1963-08-17 Perforation Treatment Performed - Jet Perforation
1963-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-30 Perforation Treatment Performed - Jet Perforation
1963-09-05 Perforation Treatment Performed - Cement Squeeze
1963-09-08 Perforation Treatment Performed - Jet Perforation
1963-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-14 Well Began Production
1963-09-14 Well Fluid changed to Crude Oil
1963-09-14 Well Mode changed to Pumping
1963-09-22 Perforation Treatment Performed - Jet Perforation
1963-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-02 Perforation Treatment Performed - Cement Squeeze
1963-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-16 Perforation Treatment Performed - Jet Perforation
1964-05-23 Well Fluid changed to Crude Oil
1964-05-23 Well Mode changed to Flowing
1988-07-21 Well Log Performed
1988-07-22 Perforation Treatment Performed - Jet Perforation
1988-07-28 Perforation Treatment Performed - Fractured
1988-12-09 Well Fluid changed to Crude Oil
1988-12-09 Well Mode changed to Flowing
1990-10-22 Well Fluid changed to Crude Oil
1990-10-22 Well Mode changed to Pumping
1991-08-01 Perforation Treatment Performed - Cement Squeeze
1991-08-07 Perforation Treatment Performed - Fractured
1991-08-07 Perforation Treatment Performed - Jet Perforation
1993-12-01 Well Fluid changed to Crude Oil
1993-12-01 Well Mode changed to Suspended
1998-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-10 Perforation Treatment Performed - Jet Perforation
1998-03-10 Perforation Treatment Performed - Remedial Casing
1998-03-10 Plug Back Performed
1998-03-10 Well Fluid changed to Crude Oil
1998-03-10 Well Log Performed
1998-03-10 Well Mode changed to Abandoned Zone
1998-05-12 Perforation Treatment Performed - Cement Plug
1998-05-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-04-24 Perforation 2171.10 2175.10 13
1963-08-12 Acid Treatment 2136.00 2139.10 0
1963-08-14 Cement Squeeze 2136.00 2139.10 0
1963-08-17 Perforation 2136.00 2139.10 7
1963-08-18 Acid Treatment 2136.00 2139.10 0
1963-08-30 Perforation 2145.80 2149.40 7
1963-09-05 Cement Squeeze 2136.00 2139.10 0
1963-09-08 Perforation 2136.60 2138.50 7
1963-09-09 Acid Treatment 2136.60 2138.50 0
1963-09-22 Perforation 2146.70 2149.40 7
1963-10-01 Acid Treatment 2146.70 2149.40 0
1961-04-24 Acid Treatment 2171.10 2175.10 0
1963-10-02 Cement Squeeze 2146.70 2149.40 0
1963-10-02 Cement Squeeze 2136.60 2138.50 0
1963-10-16 Perforation 2137.30 2139.10 7
1963-10-16 Acid Treatment 2137.30 2139.10 0
1988-07-22 Perforation 1916.00 1917.80 13
1988-07-28 Fracture 1916.00 1917.80 0
1991-08-01 Cement Squeeze 2137.30 2139.10 0
1991-08-01 Cement Squeeze 1916.00 1917.80 0
1991-08-07 Perforation 2124.50 2129.90 17
1991-08-07 Fracture 2124.50 2129.90 0
1961-09-05 Cement Squeeze 2171.10 2175.10 0
1998-03-10 Packing Device Capped w/Cement 2107.00 2115.00 0
1998-03-10 Perforation 395.50 396.50 13
1998-03-10 Remedial Casing Cementing 395.50 396.50 0
1998-05-12 Cement Plug 337.00 396.50 0
1961-09-08 Perforation 2166.20 2168.30 13
1961-09-09 Acid Treatment 2166.20 2168.30 0
1962-02-07 Perforation 2147.00 2148.80 13
1962-02-08 Acid Wash 2147.00 2148.80 0
1963-02-08 Acid Treatment 2147.00 2148.80 0
1963-08-12 Perforation 2136.00 2139.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1386 0.0 0.0 0.0
1968 960 0.0 0.0 0.0
1969 1106 0.0 0.0 0.0
1970 765 0.0 0.0 0.0
1971 644 0.0 0.0 0.0
1972 1490 0.0 0.0 0.0
1973 3437 0.0 0.0 0.0
1974 2278 0.0 0.0 0.0
1975 2792 0.0 0.0 0.0
1976 3197 0.0 0.0 0.0
1977 3623 0.0 0.0 0.0
1978 6229 0.0 0.0 0.0
1979 5468 0.0 0.0 0.0
1980 4888 0.0 0.0 0.0
1981 3746 0.0 0.0 0.0
1982 8427 0.0 0.0 0.0
1983 7862 0.0 0.0 0.0
1984 8330 0.0 0.0 0.0
1985 8350 0.0 0.0 0.0
1986 8567 0.0 0.0 0.0
1987 8723 0.0 0.0 0.0
1988 5594 0.0 0.0 0.0
1989 3772 0.0 0.0 0.0
1990 960 0.0 0.0 0.0

For data sources see[5]

References