If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395032206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.368529,"lon":-114.352405,"icon":""}]} |
Location: 00/06-22-039-03W5/0 | |
Location Alias: 00/06-22-39-03 W5M | |
Location Alias 2: 00/06-22-039-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 22 | |
County/Municipality: Lacombe County | |
Well Name: CVE MEDRIV 6-22-39-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0024715 | |
License Date: 1963-08-22 | |
License Status: Abandoned | |
Spud Date: 1963-08-28 | |
Final Drill Date: 1963-09-14 | |
Well Total Depth: 2221.40 m | |
Surface Hole Latitude: 52.368529 | |
Surface Hole Longitude: -114.352405 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-08-22 | Obtained License |
1963-08-28 | Lost Circulation Occurred |
1963-09-14 | Finished Drilling |
1963-09-14 | Well Mode changed to Drilled and Cased |
1963-09-15 | Drill Stem Test Performed |
1963-09-16 | Drill Stem Test Performed |
1963-09-17 | Production Casing Operation Performed |
1963-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-09-24 | Perforation Treatment Performed - Jet Perforation |
1963-09-27 | Well Began Production |
1963-09-27 | Well Fluid changed to Crude Oil |
1963-09-27 | Well Mode changed to Flowing |
1963-11-08 | Well Fluid changed to Crude Oil |
1963-11-08 | Well Mode changed to Pumping |
1964-03-02 | Perforation Treatment Performed - Fractured |
1965-09-24 | Well Fluid changed to Crude Oil |
1965-09-24 | Well Mode changed to Flowing |
1968-05-09 | Perforation Treatment Performed - Jet Perforation |
1968-05-10 | Perforation Treatment Performed - Cement Squeeze |
1968-05-12 | Perforation Treatment Performed - Jet Perforation |
1968-05-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-05-16 | Well Fluid changed to Crude Oil |
1968-05-16 | Well Mode changed to Flowing |
1968-06-30 | Perforation Treatment Performed - Jet Perforation |
1968-07-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-07-05 | Well Fluid changed to Crude Oil |
1968-07-05 | Well Mode changed to Pumping |
1975-02-18 | Well Fluid changed to Crude Oil |
1975-02-18 | Well Mode changed to Suspended |
1975-06-10 | Perforation Treatment Performed - Cement Squeeze |
1975-06-10 | Well Fluid changed to Crude Oil |
1975-06-10 | Well Mode changed to Abandoned Zone |
1975-06-11 | Perforation Treatment Performed - Cement Squeeze |
1975-06-15 | Perforation Treatment Performed - Jet Perforation |
1975-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-11-28 | Perforation Treatment Performed - Cement Squeeze |
1982-11-28 | Perforation Treatment Performed - Jet Perforation |
2019-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-12-06 | Perforation Treatment Performed - Jet Perforation |
2019-12-06 | Plug Back Performed |
2019-12-06 | Well Log Performed |
2019-12-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-12-07 | Perforation Treatment Performed - Jet Perforation |
2019-12-07 | Well Log Performed |
2019-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-12-08 | Perforation Treatment Performed - Cement Squeeze |
2019-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-12-09 | Perforation Treatment Performed - Jet Perforation |
2019-12-09 | Well Log Performed |
2019-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-12-10 | Perforation Treatment Performed - Cement Squeeze |
2019-12-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-09-24 | Perforation | 2104.90 | 2106.80 | 7 |
1968-07-01 | Acid Treatment | 2104.90 | 2106.80 | 0 |
1975-06-10 | Cement Squeeze | 2104.90 | 2106.80 | 0 |
1975-06-11 | Cement Squeeze | 2081.80 | 2085.40 | 0 |
1975-06-15 | Perforation | 2170.80 | 2172.00 | 7 |
1975-06-15 | Perforation | 2173.80 | 2179.30 | 7 |
1975-06-15 | Perforation | 2182.70 | 2185.70 | 7 |
1975-06-16 | Acid Treatment | 2170.80 | 2185.70 | 0 |
1982-11-28 | Perforation | 2085.00 | 2086.00 | 7 |
1982-11-28 | Cement Squeeze | 2085.00 | 2086.00 | 0 |
2019-12-06 | Packing Device Capped w/Cement | 2139.20 | 2147.20 | 0 |
1963-09-24 | Acid Treatment | 2104.90 | 2106.80 | 0 |
2019-12-06 | Perforation | 950.00 | 951.00 | 13 |
2019-12-06 | Packing Device Capped w/Cement | 2066.80 | 2074.80 | 0 |
2019-12-07 | Perforation | 437.00 | 438.00 | 13 |
2019-12-07 | Packing Device Capped w/Cement | 934.80 | 942.80 | 0 |
2019-12-07 | Perforation | 508.50 | 509.50 | 13 |
2019-12-07 | Packing Device Capped w/Cement | 494.80 | 502.80 | 0 |
2019-12-08 | Packing Device Capped w/Cement | 423.80 | 431.80 | 0 |
2019-12-08 | Cement Squeeze | 437.00 | 438.00 | 0 |
2019-12-09 | Perforation | 234.00 | 235.00 | 13 |
2019-12-09 | Packing Device Capped w/Cement | 262.80 | 270.80 | 0 |
1964-03-02 | Fracture | 2104.90 | 2106.80 | 0 |
2019-12-09 | Packing Device Capped w/Cement | 361.80 | 369.80 | 0 |
2019-12-09 | Perforation | 225.00 | 226.00 | 13 |
2019-12-09 | Perforation | 329.00 | 330.00 | 13 |
2019-12-09 | Perforation | 376.00 | 377.00 | 13 |
2019-12-09 | Perforation | 278.00 | 279.00 | 13 |
2019-12-09 | Packing Device Capped w/Cement | 313.80 | 321.80 | 0 |
2019-12-10 | Cement Squeeze | 225.00 | 235.00 | 0 |
2019-12-10 | Packing Device Capped w/Cement | 212.80 | 220.80 | 0 |
1968-05-09 | Perforation | 2091.50 | 2092.10 | 3 |
1968-05-10 | Cement Squeeze | 2091.50 | 2092.10 | 0 |
1968-05-10 | Cement Squeeze | 2104.90 | 2106.80 | 0 |
1968-05-12 | Perforation | 2081.80 | 2085.40 | 7 |
1968-05-15 | Acid Treatment | 2081.80 | 2085.40 | 0 |
1968-06-30 | Perforation | 2104.90 | 2106.80 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 2580 | 0.0 | 0.0 | 0.0 |
1968 | 4702 | 0.0 | 0.0 | 0.0 |
1969 | 1488 | 0.0 | 0.0 | 0.0 |
1970 | 1962 | 0.0 | 0.0 | 0.0 |
1971 | 1752 | 0.0 | 0.0 | 0.0 |
1972 | 2180 | 0.0 | 0.0 | 0.0 |
1973 | 3120 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1963-08-28 | Lost Circulation | 27.40 | 27.40 |
2019-12-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]