X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032210002

Well Details

Well ID: 0395032210002
Loading map...
Location: 00/10-22-039-03W5/2
Location Alias: 00/10-22-39-03 W5M
Location Alias 2: 00/10-22-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 22
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 10-22-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0024047
License Date: 1963-04-11
License Status: Abandoned
Spud Date: 1963-05-12
Final Drill Date: 1963-05-31
Well Total Depth: 2179.30 m
Surface Hole Latitude: 52.372214
Surface Hole Longitude: -114.346935

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-04-11 Obtained License
1963-05-31 Finished Drilling
1963-05-31 Well Mode changed to Drilled and Cased
1963-06-01 Drill Stem Test Performed
1963-06-02 Drill Stem Test Performed
1963-06-03 Drill Stem Test Performed
1963-06-04 Drill Stem Test Performed
1963-06-05 Drill Stem Test Performed
1963-06-06 Production Casing Operation Performed
1963-06-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-10 Perforation Treatment Performed - Cement Squeeze
1973-03-14 Perforation Treatment Performed - Jet Perforation
1973-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-05-31 Perforation Treatment Performed - Jet Perforation
1979-06-07 Well Began Production
1979-06-07 Well Fluid changed to Crude Oil
1979-06-07 Well Mode changed to Flowing
1979-06-15 Well Fluid changed to Crude Oil
1979-06-15 Well Mode changed to Suspended
1987-04-30 Well Fluid changed to Crude Oil
1987-04-30 Well Mode changed to Flowing
1987-08-09 Well Fluid changed to Crude Oil
1987-08-09 Well Mode changed to Pumping
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Suspended
1998-03-07 Well Log Performed
1998-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-11 Plug Back Performed
1998-03-11 Well Fluid changed to Crude Oil
1998-03-11 Well Log Performed
1998-03-11 Well Mode changed to Abandoned Zone
2008-08-17 Well Log Performed
2008-08-21 Perforation Treatment Performed - Jet Perforation
2008-08-22 Perforation Treatment Performed - Remedial Casing
2008-08-22 Well Log Performed
2008-08-24 Perforation Treatment Performed - Jet Perforation
2008-08-25 Perforation Treatment Performed - Jet Perforation
2008-08-25 Perforation Treatment Performed - Remedial Casing
2008-08-26 Perforation Treatment Performed - Remedial Casing
2008-08-28 Perforation Treatment Performed - Jet Perforation
2008-08-29 Perforation Treatment Performed - Remedial Casing
2008-09-02 Perforation Treatment Performed - Jet Perforation
2008-09-02 Perforation Treatment Performed - Remedial Casing
2008-09-09 Well Abandoned
2008-09-09 Well Fluid changed to Crude Oil
2008-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-10 Hydra Jet Perforation 2133.00 2133.00 0
1998-03-11 Packing Device Capped w/Cement 2059.00 2067.00 0
2008-08-21 Perforation 994.00 995.00 20
2008-08-22 Remedial Casing Cementing 994.00 995.00 0
2008-08-24 Perforation 515.00 516.00 20
2008-08-25 Remedial Casing Cementing 515.00 516.00 0
2008-08-25 Perforation 510.00 511.00 20
2008-08-26 Remedial Casing Cementing 510.00 511.00 0
2008-08-28 Perforation 494.00 495.00 20
2008-08-29 Remedial Casing Cementing 494.00 495.00 0
2008-09-02 Perforation 329.00 330.00 20
1963-06-10 Hydra Jet Perforation 2134.20 2134.20 0
2008-09-02 Remedial Casing Cementing 329.00 330.00 0
1963-06-11 Acid Treatment 2133.00 2134.20 0
1973-03-09 Acid Treatment 2133.00 2134.20 0
1973-03-10 Cement Squeeze 2133.00 2134.20 0
1973-03-14 Perforation 2139.10 2142.10 7
1973-03-15 Acid Treatment 2139.10 2142.10 0
1979-05-31 Packing Device Capped w/Cement 2121.80 2131.00 0
1979-05-31 Perforation 2076.50 2078.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 91 0.0 0.0 0.0
1987 5430 0.0 0.0 0.0
1988 8743 0.0 0.0 0.0
1989 8643 0.0 0.0 0.0
1990 8419 0.0 0.0 0.0
1991 7857 0.0 0.0 0.0
1992 8585 0.0 0.0 0.0
1993 5127 0.0 0.0 0.0

For data sources see[5]

References