If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395032302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.364446,"lon":-114.323253,"icon":""}]} |
Location: 00/02-23-039-03W5/0 | |
Location Alias: 00/02-23-39-03 W5M | |
Location Alias 2: 00/02-23-039-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 23 | |
County/Municipality: Lacombe County | |
Well Name: HUGES MEDR 2-23-39-3 | |
Operator Name: The Paddon Hughes Development Co. Ltd. | |
License Number: 0066641 | |
License Date: 1977-11-09 | |
License Status: RecCertified | |
Spud Date: 1977-11-19 | |
Final Drill Date: 1977-12-04 | |
Well Total Depth: 2171.70 m | |
Surface Hole Latitude: 52.364446 | |
Surface Hole Longitude: -114.323253 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-11-09 | Obtained License |
1977-12-04 | Finished Drilling |
1977-12-04 | Well Mode changed to Drilled and Cased |
1977-12-06 | Drill Stem Test Performed |
1977-12-07 | Drill Stem Test Performed |
1977-12-12 | Drill Stem Test Performed |
1977-12-14 | Production Casing Operation Performed |
1978-01-22 | Perforation Treatment Performed - Jet Perforation |
1978-01-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-06-02 | Well Began Production |
1978-06-02 | Well Fluid changed to Crude Oil |
1978-06-02 | Well Mode changed to Pumping |
1980-05-16 | Perforation Treatment Performed - Jet Perforation |
1980-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-05-22 | Perforation Treatment Performed - Fractured |
1980-05-27 | Perforation Treatment Performed - Jet Perforation |
1980-05-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-05-31 | Well Fluid changed to Crude Oil |
1980-05-31 | Well Mode changed to Suspended |
1981-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-09-10 | Well Abandoned |
1981-09-10 | Well Fluid changed to Crude Oil |
1981-09-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-01-22 | Perforation | 2073.60 | 2074.50 | 7 |
1978-01-24 | Acid Treatment | 2073.60 | 2074.50 | 0 |
1980-05-16 | Perforation | 2129.00 | 2134.20 | 7 |
1980-05-20 | Acid Treatment | 2073.60 | 2134.20 | 0 |
1980-05-22 | Fracture | 2073.60 | 2134.20 | 0 |
1980-05-27 | Perforation | 2141.80 | 2148.20 | 7 |
1980-05-28 | Acid Treatment | 2141.80 | 2148.20 | 0 |
1981-09-10 | Packing Device Capped w/Cement | 2112.00 | 2120.00 | 0 |
1981-09-10 | Packing Device Capped w/Cement | 2057.00 | 2065.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 1333 | 0.0 | 0.0 | 0.0 |
1979 | 619 | 0.0 | 0.0 | 0.0 |
1980 | 68 | 0.0 | 0.0 | 0.0 |
For data sources see[5]