X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032814002

Well Details

Well ID: 0395032814002
Loading map...
Location: 00/14-28-039-03W5/2
Location Alias: 00/14-28-39-03 W5M
Location Alias 2: 00/14-28-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 28
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 14-28-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0017271
License Date: 1959-06-17
License Status: Suspension
Spud Date: 1959-06-30
Final Drill Date: 1959-07-17
Well Total Depth: 2154.90 m
Surface Hole Latitude: 52.390331
Surface Hole Longitude: -114.376416

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-17 Obtained License
1959-07-17 Finished Drilling
1959-07-17 Well Mode changed to Drilled and Cased
1959-07-18 Drill Stem Test Performed
1959-07-19 Production Casing Operation Performed
1959-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-23 Perforation Treatment Performed - Bullet Perforation
1959-07-23 Perforation Treatment Performed - Fractured
1974-09-18 Perforation Treatment Performed - Jet Perforation
1974-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-20 Perforation Treatment Performed - Cement Squeeze
1985-06-06 Well Log Performed
1986-02-13 Perforation Treatment Performed - Jet Perforation
1986-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-28 Well Log Performed
1994-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-31 Perforation Treatment Performed - Jet Perforation
1994-10-31 Well Log Performed
1994-12-19 Well Began Production
1994-12-19 Well Fluid changed to Gas
1994-12-19 Well Mode changed to Flowing
1999-10-14 Well Fluid changed to Gas
1999-10-14 Well Mode changed to Suspended
2002-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-15 Plug Back Performed
2002-11-15 Well Fluid changed to Gas
2002-11-15 Well Log Performed
2002-11-15 Well Mode changed to Abandoned Zone
2003-08-06 Perforation Treatment Performed - Jet Perforation
2003-08-06 Well Fluid changed to Gas
2003-08-06 Well Mode changed to Suspended
2003-08-18 Well Fluid changed to Gas
2003-08-18 Well Mode changed to Flowing
2009-09-29 Well Fluid changed to Gas
2009-09-29 Well Mode changed to Pumping
2018-07-16 Well Fluid changed to Gas
2018-07-16 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-23 Bullet Perforation 2135.40 2136.60 7
1994-10-29 Packing Device Capped w/Cement 2122.00 2123.00 0
1994-10-31 Perforation 2100.00 2116.50 13
2002-11-15 Packing Device Capped w/Cement 2093.00 2095.00 0
2003-08-06 Perforation 2100.00 2116.50 13
1959-07-23 Bullet Perforation 2139.10 2140.00 13
1959-07-23 Acid Treatment 2135.40 2140.00 0
1959-07-23 Fracture 2135.40 2140.00 0
1974-09-18 Perforation 2125.40 2125.70 13
1974-09-20 Acid Treatment 2125.40 2125.70 0
1974-09-20 Cement Squeeze 2125.40 2125.70 0
1986-02-13 Perforation 2132.20 2134.20 12
1986-02-14 Acid Treatment 2132.20 2134.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 334 0.0 0.0 0.0
1995 7718 0.0 0.0 0.0
1996 6356 0.0 0.0 0.0
2003 3216 0.0 0.0 0.0
2004 8659 0.0 0.0 0.0
2005 8185 0.0 0.0 0.0
2006 8523 0.0 0.0 0.0
2007 8657 0.0 0.0 0.0
2008 8622 0.0 0.0 0.0
2009 8380 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8463 0.0 0.0 0.0
2012 8707 0.0 0.0 0.0
2013 8579 0.0 0.0 0.0
2014 6002 0.0 0.0 0.0
2016 238 0.0 0.0 0.0

For data sources see[5]

References