X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032910000

Well Details

Well ID: 0395032910000
Loading map...
Location: 00/10-29-039-03W5/0
Location Alias: 00/10-29-39-03 W5M
Location Alias 2: 00/10-29-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 29
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 10-29-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0022590
License Date: 1962-06-13
License Status: RecCertified
Spud Date: 1962-06-20
Final Drill Date: 1962-07-04
Well Total Depth: 2191.50 m
Surface Hole Latitude: 52.386655
Surface Hole Longitude: -114.394454

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-06-13 Obtained License
1962-07-04 Finished Drilling
1962-07-04 Well Mode changed to Drilled and Cased
1962-07-06 Production Casing Operation Performed
1962-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-07 Perforation Treatment Performed - Jet Perforation
1962-07-26 Well Began Production
1962-07-26 Well Fluid changed to Crude Oil
1962-07-26 Well Mode changed to Pumping
1984-05-11 Well Log Performed
1984-05-12 Well Log Performed
1984-05-15 Perforation Treatment Performed - Cement Squeeze
1984-05-22 Perforation Treatment Performed - Jet Perforation
1984-05-22 Well Log Performed
1984-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-16 Perforation Treatment Performed - Cement Squeeze
1985-04-23 Perforation Treatment Performed - Abrasa-Jet Perforation
1985-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-23 Well Log Performed
1985-04-30 Well Log Performed
1985-05-01 Perforation Treatment Performed - Abrasa-Jet Perforation
1985-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-10 Well Fluid changed to Crude Oil
1985-06-10 Well Mode changed to Suspended
1997-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-23 Perforation Treatment Performed - Jet Perforation
1997-01-23 Perforation Treatment Performed - Remedial Casing
1997-01-23 Plug Back Performed
1997-01-23 Well Log Performed
1997-01-24 Well Abandoned
1997-01-24 Well Fluid changed to Crude Oil
1997-01-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-07-07 Perforation 2160.40 2163.50 7
1985-05-03 Acid Treatment 2152.00 2156.50 0
1997-01-23 Packing Device Capped w/Cement 2131.50 2139.50 0
1997-01-23 Perforation 400.00 401.00 14
1997-01-23 Remedial Casing Cementing 400.00 401.00 0
1962-07-07 Acid Treatment 2160.40 2163.50 0
1984-05-15 Cement Squeeze 2160.40 2163.50 0
1984-05-22 Perforation 2159.00 2161.00 13
1984-05-23 Acid Treatment 2159.00 2161.00 0
1985-04-16 Cement Squeeze 2159.00 2161.00 0
1985-04-23 Hydra Jet Perforation 2152.00 2153.00 0
1985-04-23 Acid Treatment 2152.00 2153.00 0
1985-05-01 Hydra Jet Perforation 2155.50 2156.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8123 0.0 0.0 0.0
1968 6238 0.0 0.0 0.0
1969 7980 0.0 0.0 0.0
1970 3889 0.0 0.0 0.0
1971 504 0.0 0.0 0.0
1984 2628 0.0 0.0 0.0
1985 680 0.0 0.0 0.0

For data sources see[5]

References