X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240208002

Well Details

Well ID: 0404240208002
Loading map...
Location: 00/08-02-040-24W4/2
Location Alias: 00/08-02-40-24 W4M
Location Alias 2: 00/08-02-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 8-2-40-24
Operator Name: Enhance Energy Inc.
License Number: 0107840
License Date: 1984-06-22
License Status: Issued
Spud Date: 1984-08-03
Final Drill Date: 1984-08-14
Well Total Depth: 1965.00 m
Surface Hole Latitude: 52.410605
Surface Hole Longitude: -113.342428

For data sources see[1][2]

Well History

Date Event
1984-06-22 Obtained License
1984-08-03 Surface Casing Operation Performed
1984-08-14 Finished Drilling
1984-08-14 Well Mode changed to Drilled and Cased
1984-08-15 Lost Circulation Occurred
1984-08-15 Well Log Performed
1984-08-16 Production Casing Operation Performed
1984-08-16 Rig Released
1984-10-17 Well Log Performed
1984-10-18 Perforation Treatment Performed - Jet Perforation
1984-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-24 Perforation Treatment Performed - Jet Perforation
1984-12-07 Well Began Production
1984-12-07 Well Fluid changed to Crude Oil
1984-12-07 Well Mode changed to Pumping
1988-07-19 Well Log Performed
1988-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-21 Perforation Treatment Performed - Jet Perforation
1993-03-10 Perforation Treatment Performed - Cement Squeeze
1993-03-11 Perforation Treatment Performed - Cement Squeeze
1993-03-16 Perforation Treatment Performed - Jet Perforation
1993-03-18 Perforation Treatment Performed - Jet Perforation
1993-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-18 Well Log Performed
1994-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-25 Perforation Treatment Performed - Cement Squeeze
1994-11-29 Well Log Performed
1994-11-30 Perforation Treatment Performed - Jet Perforation
1994-12-02 Well Log Performed
1994-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-03 Perforation Treatment Performed - Jet Perforation
1994-12-03 Plug Back Performed
1994-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-13 Well Log Performed
1996-04-30 Well Fluid changed to Crude Oil
1996-04-30 Well Mode changed to Suspended
1998-10-14 Perforation Treatment Performed - Jet Perforation
1998-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-02 Well Fluid changed to Crude Oil
1999-02-02 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-18 Perforation 1925.00 1928.00 13
1993-03-16 Perforation 1920.50 1921.50 17
1993-03-18 Perforation 1875.50 1877.00 17
1993-03-19 Acid Treatment 1875.50 1877.00 0
1993-03-20 Acid Treatment 1875.50 1877.00 0
1994-11-22 Acid Treatment 1920.50 1921.50 0
1994-11-25 Cement Squeeze 1920.50 1921.50 0
1994-11-25 Cement Squeeze 1875.50 1877.00 0
1994-11-30 Perforation 1914.00 1919.00 13
1994-12-03 Packing Device Capped w/Cement 1902.00 1910.00 0
1994-12-03 Perforation 1868.50 1874.50 13
1984-10-23 Acid Treatment 1925.00 1928.00 0
1994-12-09 Acid Treatment 1868.50 1874.50 0
1994-12-12 Packing Device Capped w/Cement 1857.00 1865.00 0
1998-10-14 Perforation 1868.50 1874.50 13
1998-10-16 Acid Treatment 1868.50 1874.50 0
1984-10-24 Perforation 1887.00 1889.00 13
1984-10-24 Acid Treatment 1887.00 1889.00 0
1988-07-20 Acid Treatment 1887.00 1887.50 0
1988-07-21 Perforation 1887.00 1887.50 14
1988-07-21 Acid Treatment 1887.00 1887.50 0
1993-03-10 Cement Squeeze 1925.00 1928.00 0
1993-03-11 Cement Squeeze 1887.00 1889.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 600 0.0 0.0 0.0
1985 8705 0.0 0.0 0.0
1986 7875 0.0 0.0 0.0
1987 8452 0.0 0.0 0.0
1988 8222 0.0 0.0 0.0
1989 8276 0.0 0.0 0.0
1990 8396 0.0 0.0 0.0
1991 8177 0.0 0.0 0.0
1992 5162 0.0 0.0 0.0
1993 6911 0.0 0.0 0.0
1994 7295 0.0 0.0 0.0
1999 7238 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8219 0.0 0.0 0.0
2002 8444 0.0 0.0 0.0
2003 8666 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8471 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8756 0.0 0.0 0.0
2008 7735 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8723 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 7544 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 7343 0.0 0.0 0.0
2015 744 0.0 0.0 0.0
2016 3647 0.0 0.0 0.0
2017 48 0.0 0.0 0.0
2019 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-08-15 Lost Circulation 1965.00 1965.00

For data sources see[6]

References