X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240213000

Well Details

Well ID: 0404240213000
Loading map...
Location: 00/13-02-040-24W4/0
Location Alias: 00/13-02-40-24 W4M
Location Alias 2: 00/13-02-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 13-2-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0295527
License Date: 2003-11-04
License Status: Suspension
Spud Date: 2003-11-25
Final Drill Date: 2003-12-04
Well Total Depth: 1930.00 m
Surface Hole Latitude: 52.417813
Surface Hole Longitude: -113.359630

For data sources see[1][2]

Well History

Date Event
2003-11-04 Obtained License
2003-11-26 Surface Casing Operation Performed
2003-12-04 Finished Drilling
2003-12-04 Well Mode changed to Drilled and Cased
2003-12-05 Well Log Performed
2003-12-07 Production Casing Operation Performed
2003-12-07 Rig Released
2003-12-16 Perforation Treatment Performed - Jet Perforation
2003-12-16 Well Log Performed
2004-01-01 Well Began Production
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Pumping
2004-07-28 Perforation Treatment Performed - Jet Perforation
2004-07-29 Perforation Treatment Performed - Cement Squeeze
2004-08-04 Perforation Treatment Performed - Jet Perforation
2004-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-30 Well Fluid changed to Crude Oil
2011-11-30 Well Mode changed to Suspended
2016-08-11 Perforation Treatment Performed - Cement Squeeze
2016-08-11 Plug Back Performed
2016-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-12 Plug Back Performed
2016-08-12 Well Fluid changed to Crude Oil
2016-08-12 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-16 Perforation 1885.50 1887.00 17
2004-07-28 Perforation 1888.50 1888.80 99
2004-07-29 Cement Squeeze 1885.00 1888.80 0
2004-08-04 Perforation 1885.00 1886.50 17
2004-08-05 Acid Treatment 1885.00 1886.50 0
2016-08-11 Cement Squeeze 1885.00 1886.50 0
2016-08-12 Packing Device Capped w/Cement 1650.00 1883.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 8451 0.0 0.0 0.0
2005 8471 0.0 0.0 0.0
2006 8519 0.0 0.0 0.0
2007 8756 0.0 0.0 0.0
2008 7879 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8706 0.0 0.0 0.0
2011 6745 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References