X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241209000

Well Details

Well ID: 0404241209000
Loading map...
Location: 00/09-12-040-24W4/0
Location Alias: 00/09-12-40-24 W4M
Location Alias 2: 00/09-12-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 12
County/Municipality: Lacombe County
Well Name: ANADARKO ALIX 9-12-40-24
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0026101
License Date: 1964-05-15
License Status: RecCertified
Spud Date: 1964-05-18
Final Drill Date: 1964-05-30
Well Total Depth: 1834.90 m
Surface Hole Latitude: 52.428523
Surface Hole Longitude: -113.317823

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-15 Obtained License
1964-05-30 Finished Drilling
1964-05-30 Well Mode changed to Drilled and Cased
1964-06-03 Production Casing Operation Performed
1964-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-09 Perforation Treatment Performed - Jet Perforation
1964-06-15 Perforation Treatment Performed - Cement Squeeze
1964-06-17 Perforation Treatment Performed - Jet Perforation
1964-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-25 Perforation Treatment Performed - Cement Squeeze
1964-06-26 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-28 Perforation Treatment Performed - Jet Perforation
1964-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-30 Perforation Treatment Performed - Condensate Squeeze
1964-07-05 Well Began Production
1964-07-05 Well Fluid changed to Crude Oil
1964-07-05 Well Mode changed to Flowing
1964-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-20 Perforation Treatment Performed - Condensate Squeeze
1964-11-21 Perforation Treatment Performed - Fractured
1964-11-26 Well Fluid changed to Crude Oil
1964-11-26 Well Mode changed to Pumping
1974-02-22 Perforation Treatment Performed - Cement Plug
1974-02-22 Well Abandoned
1974-02-22 Well Fluid changed to Crude Oil
1974-02-22 Well Mode changed to Abandoned
1974-03-05 Perforation Treatment Performed - Cement Plug
1974-03-06 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-09 Perforation 1812.00 1812.60 7
1964-06-28 Perforation 1808.40 1809.60 7
1964-06-28 Acid Treatment 1808.40 1809.60 0
1964-06-29 Acid Treatment 1808.40 1809.60 0
1964-06-30 Condensate Squeeze 1808.40 1809.60 0
1964-06-30 Acid Treatment 1808.40 1809.60 0
1964-10-17 Acid Treatment 1808.40 1809.60 0
1964-11-20 Condensate Squeeze 1808.40 1809.60 0
1964-11-21 Fracture 1808.40 1809.60 0
1974-02-22 Cement Plug 1773.90 1810.80 0
1974-03-05 Cement Plug 475.50 527.30 0
1964-06-09 Acid Treatment 1812.00 1812.60 0
1974-03-06 Cement Plug 170.70 198.10 0
1964-06-15 Cement Squeeze 1812.00 1812.60 0
1964-06-17 Perforation 1810.50 1810.80 10
1964-06-18 Acid Treatment 1810.50 1810.80 0
1964-06-25 Cement Squeeze 1810.50 1810.80 0
1964-06-26 Hydra Jet Perforation 1809.30 1809.30 0
1964-06-26 Acid Treatment 1809.30 1809.30 0
1964-06-27 Acid Treatment 1809.30 1809.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4869 0.0 0.0 0.0
1968 7315 0.0 0.0 0.0
1969 5923 0.0 0.0 0.0
1970 5147 0.0 0.0 0.0
1971 1599 0.0 0.0 0.0
1972 641 0.0 0.0 0.0

For data sources see[5]

References