X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241503000

Well Details

Well ID: 0404241503000
Loading map...
Location: 00/03-15-040-24W4/0
Location Alias: 00/03-15-40-24 W4M
Location Alias 2: 00/03-15-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 3-15-40-24
Operator Name: Enhance Energy Inc.
License Number: 0028323
License Date: 1965-06-03
License Status: Issued
Spud Date: 1965-06-21
Final Drill Date: 1965-07-04
Well Total Depth: 1950.70 m
Surface Hole Latitude: 52.436069
Surface Hole Longitude: -113.378314

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-06-03 Obtained License
1965-07-04 Finished Drilling
1965-07-04 Well Mode changed to Drilled and Cased
1965-07-06 Drill Stem Test Performed
1965-07-07 Drill Stem Test Performed
1965-07-08 Drill Stem Test Performed
1965-07-09 Production Casing Operation Performed
1965-07-21 Perforation Treatment Performed - Jet Perforation
1965-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-25 Well Began Production
1965-07-25 Well Fluid changed to Crude Oil
1965-07-25 Well Mode changed to Flowing
1965-08-05 Perforation Treatment Performed - Jet Perforation
1965-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-06 Perforation Treatment Performed - Acid Wash - No Pressure
1965-08-09 Well Fluid changed to Crude Oil
1965-08-09 Well Mode changed to Flowing
1980-12-02 Well Fluid changed to Crude Oil
1980-12-02 Well Mode changed to Pumping
1982-05-19 Perforation Treatment Performed - Cement Plug
1982-05-19 Well Fluid changed to Crude Oil
1982-05-19 Well Mode changed to Abandoned Zone
1992-01-21 Well Log Performed
1992-01-23 Perforation Treatment Performed - Cement Squeeze
1992-01-25 Perforation Treatment Performed - Jet Perforation
1992-06-25 Perforation Treatment Performed - Cement Squeeze
1992-06-25 Well Log Performed
1992-07-02 Perforation Treatment Performed - Jet Perforation
1992-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-22 Perforation Treatment Performed - Cement Squeeze
1994-03-22 Plug Back Performed
1994-03-30 Perforation Treatment Performed - Jet Perforation
1994-03-30 Well Log Performed
1994-03-31 Well Fluid changed to Crude Oil
1994-03-31 Well Mode changed to Pumping
1997-06-23 Well Log Performed
1997-06-24 Well Log Performed
1997-06-25 Perforation Treatment Performed - Jet Perforation
1997-06-25 Plug Back Performed
1997-07-11 Well Fluid changed to Crude Oil
1997-07-11 Well Mode changed to Suspended
1997-07-12 Well Fluid changed to Crude Oil
1997-07-12 Well Mode changed to Suspended
1999-08-31 Well Log Performed
2002-09-11 Plug Back Performed
2002-09-14 Perforation Treatment Performed - Jet Perforation
2003-11-26 Perforation Treatment Performed - Jet Perforation
2003-11-26 Well Log Performed
2003-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-01 Well Log Performed
2003-12-02 Perforation Treatment Performed - Cement Squeeze
2003-12-02 Plug Back Performed
2003-12-12 Well Fluid changed to Crude Oil
2003-12-12 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-21 Perforation 1926.60 1927.60 7
1992-07-02 Perforation 1882.30 1883.80 20
1992-07-06 Acid Treatment 1882.30 1883.80 0
1994-03-22 Cement Squeeze 1882.30 1883.80 0
1994-03-30 Perforation 1917.00 1920.00 17
1997-06-25 Perforation 1874.00 1878.00 17
2002-09-14 Perforation 1620.00 1622.50 17
2003-11-26 Perforation 1910.00 1911.70 17
2003-11-26 Perforation 1913.00 1913.50 17
2003-11-27 Acid Treatment 1910.00 1913.50 0
2003-12-02 Cement Squeeze 1874.00 1878.00 0
1965-07-22 Acid Treatment 1926.60 1927.60 0
2003-12-02 Cement Squeeze 1620.00 1622.50 0
1965-08-05 Perforation 1891.30 1892.20 7
1965-08-06 Acid Wash 1891.30 1892.20 0
1965-08-06 Acid Treatment 1891.30 1892.20 0
1982-05-19 Cement Plug 1905.00 1928.00 0
1992-01-23 Cement Squeeze 1891.30 1892.20 0
1992-01-25 Perforation 1886.10 1887.90 20
1992-06-25 Cement Squeeze 1886.10 1887.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4590 0.0 0.0 0.0
1968 3914 0.0 0.0 0.0
1969 2826 0.0 0.0 0.0
1970 3452 0.0 0.0 0.0
1971 5505 0.0 0.0 0.0
1972 6929 0.0 0.0 0.0
1973 6946 0.0 0.0 0.0
1974 4310 0.0 0.0 0.0
1975 2104 0.0 0.0 0.0
1976 2896 0.0 0.0 0.0
1980 500 0.0 0.0 0.0
1981 2447 0.0 0.0 0.0
1994 6450 0.0 0.0 0.0
1995 8433 0.0 0.0 0.0
1996 7945 0.0 0.0 0.0
1997 2977 0.0 0.0 0.0
2003 449 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7919 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8756 0.0 0.0 0.0
2008 7927 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 744 0.0 0.0 0.0
2011 744 0.0 0.0 0.0
2012 7028 0.0 0.0 0.0
2013 7488 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8279 0.0 0.0 0.0
2017 8716 0.0 0.0 0.0
2018 7836 0.0 0.0 0.0
2019 4895 0.0 0.0 0.0

For data sources see[5]

References