X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241503002

Well Details

Well ID: 0404241503002
Loading map...
Location: 00/03-15-040-24W4/2
Location Alias: 00/03-15-40-24 W4M
Location Alias 2: 00/03-15-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 3-15-40-24
Operator Name: Enhance Energy Inc.
License Number: 0028323
License Date: 1965-06-03
License Status: Issued
Spud Date: 1965-06-21
Final Drill Date: 1965-07-04
Well Total Depth: 1950.70 m
Surface Hole Latitude: 52.436069
Surface Hole Longitude: -113.378314

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-06-03 Obtained License
1965-07-04 Finished Drilling
1965-07-04 Well Mode changed to Drilled and Cased
1965-07-06 Drill Stem Test Performed
1965-07-07 Drill Stem Test Performed
1965-07-08 Drill Stem Test Performed
1965-07-09 Production Casing Operation Performed
1965-07-21 Perforation Treatment Performed - Jet Perforation
1965-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-05 Perforation Treatment Performed - Jet Perforation
1965-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-06 Perforation Treatment Performed - Acid Wash - No Pressure
1965-08-09 Well Began Production
1965-08-09 Well Fluid changed to Crude Oil
1965-08-09 Well Mode changed to Flowing
1981-05-04 Well Fluid changed to Crude Oil
1981-05-04 Well Mode changed to Pumping
1982-05-19 Perforation Treatment Performed - Cement Plug
1982-05-19 Well Fluid changed to Crude Oil
1982-05-19 Well Mode changed to Pumping
1992-01-21 Well Log Performed
1992-01-23 Perforation Treatment Performed - Cement Squeeze
1992-01-25 Perforation Treatment Performed - Jet Perforation
1992-06-25 Perforation Treatment Performed - Cement Squeeze
1992-06-25 Well Log Performed
1992-07-02 Perforation Treatment Performed - Jet Perforation
1992-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-01 Well Fluid changed to Crude Oil
1993-10-01 Well Mode changed to Suspended
1994-03-22 Perforation Treatment Performed - Cement Squeeze
1994-03-22 Plug Back Performed
1994-03-22 Well Fluid changed to Crude Oil
1994-03-22 Well Mode changed to Abandoned Zone
1994-03-30 Perforation Treatment Performed - Jet Perforation
1994-03-30 Well Log Performed
1997-06-23 Well Log Performed
1997-06-24 Well Log Performed
1997-06-25 Perforation Treatment Performed - Jet Perforation
1997-06-25 Plug Back Performed
1997-07-12 Well Fluid changed to Crude Oil
1997-07-12 Well Mode changed to Pumping
1998-01-08 Well Fluid changed to Crude Oil
1998-01-08 Well Mode changed to Suspended
1999-08-31 Well Log Performed
2002-09-11 Plug Back Performed
2002-09-14 Perforation Treatment Performed - Jet Perforation
2003-11-26 Perforation Treatment Performed - Jet Perforation
2003-11-26 Well Log Performed
2003-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-01 Well Log Performed
2003-12-02 Perforation Treatment Performed - Cement Squeeze
2003-12-02 Plug Back Performed
2003-12-02 Well Fluid changed to Crude Oil
2003-12-02 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-21 Perforation 1926.60 1927.60 7
1992-07-02 Perforation 1882.30 1883.80 20
1992-07-06 Acid Treatment 1882.30 1883.80 0
1994-03-22 Cement Squeeze 1882.30 1883.80 0
1994-03-30 Perforation 1917.00 1920.00 17
1997-06-25 Perforation 1874.00 1878.00 17
2002-09-14 Perforation 1620.00 1622.50 17
2003-11-26 Perforation 1910.00 1911.70 17
2003-11-26 Perforation 1913.00 1913.50 17
2003-11-27 Acid Treatment 1910.00 1913.50 0
2003-12-02 Cement Squeeze 1874.00 1878.00 0
1965-07-22 Acid Treatment 1926.60 1927.60 0
2003-12-02 Cement Squeeze 1620.00 1622.50 0
1965-08-05 Perforation 1891.30 1892.20 7
1965-08-06 Acid Wash 1891.30 1892.20 0
1965-08-06 Acid Treatment 1891.30 1892.20 0
1982-05-19 Cement Plug 1905.00 1928.00 0
1992-01-23 Cement Squeeze 1891.30 1892.20 0
1992-01-25 Perforation 1886.10 1887.90 20
1992-06-25 Cement Squeeze 1886.10 1887.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4129 0.0 0.0 0.0
1968 3270 0.0 0.0 0.0
1969 2392 0.0 0.0 0.0
1970 2856 0.0 0.0 0.0
1971 5401 0.0 0.0 0.0
1972 6095 0.0 0.0 0.0
1973 2229 0.0 0.0 0.0
1974 890 0.0 0.0 0.0
1975 5053 0.0 0.0 0.0
1976 5630 0.0 0.0 0.0
1977 8255 0.0 0.0 0.0
1978 8547 0.0 0.0 0.0
1979 8491 0.0 0.0 0.0
1980 7569 0.0 0.0 0.0
1981 5476 0.0 0.0 0.0
1982 7798 0.0 0.0 0.0
1983 8755 0.0 0.0 0.0
1984 8431 0.0 0.0 0.0
1985 8741 0.0 0.0 0.0
1986 7179 0.0 0.0 0.0
1987 8404 0.0 0.0 0.0
1988 8663 0.0 0.0 0.0
1989 3115 0.0 0.0 0.0
1990 2905 0.0 0.0 0.0
1991 1656 0.0 0.0 0.0
1993 1067 0.0 0.0 0.0
1997 3633 0.0 0.0 0.0
1998 168 0.0 0.0 0.0

For data sources see[5]

References