X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241505002

Well Details

Well ID: 0404241505002
Loading map...
Location: 00/05-15-040-24W4/2
Location Alias: 00/05-15-40-24 W4M
Location Alias 2: 00/05-15-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 5-15-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006920
License Date: 1953-08-12
License Status: Suspension
Spud Date: 1953-08-13
Final Drill Date: 1953-09-09
Well Total Depth: 1947.70 m
Surface Hole Latitude: 52.439546
Surface Hole Longitude: -113.384448

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-12 Obtained License
1953-09-04 Drill Stem Test Performed
1953-09-06 Drill Stem Test Performed
1953-09-08 Drill Stem Test Performed
1953-09-09 Drill Stem Test Performed
1953-09-09 Finished Drilling
1953-09-09 Production Casing Operation Performed
1953-09-09 Well Mode changed to Drilled and Cased
1953-09-13 Perforation Treatment Performed - Jet Perforation
1957-07-24 Perforation Treatment Performed - Acid Wash - No Pressure
1957-10-06 Perforation Treatment Performed - Cement Squeeze
1957-10-10 Perforation Treatment Performed - Bullet Perforation
1957-10-13 Perforation Treatment Performed - Acid Wash - No Pressure
1977-08-18 Well Log Performed
1978-02-16 Perforation Treatment Performed - Cement Squeeze
1978-02-22 Perforation Treatment Performed - Jet Perforation
1978-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-08 Perforation Treatment Performed - Cement Squeeze
1982-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-11 Perforation Treatment Performed - Jet Perforation
1994-04-22 Well Log Performed
1994-04-25 Perforation Treatment Performed - Cement Squeeze
1994-04-25 Plug Back Performed
1994-04-26 Perforation Treatment Performed - Jet Perforation
1994-04-26 Well Log Performed
1994-04-27 Perforation Treatment Performed - Acid Wash - No Pressure
1994-04-29 Perforation Treatment Performed - Jet Perforation
1994-04-29 Well Log Performed
1994-05-04 Perforation Treatment Performed - Cement Squeeze
1994-05-04 Plug Back Performed
1996-03-10 Well Log Performed
1996-03-12 Perforation Treatment Performed - Cement Squeeze
1996-03-12 Plug Back Performed
1996-03-13 Perforation Treatment Performed - Jet Perforation
1996-03-15 Perforation Treatment Performed - Jet Perforation
1996-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-01 Well Began Production
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Flowing
1997-09-04 Well Fluid changed to Crude Oil
1997-09-04 Well Mode changed to Suspended
2007-10-29 Well Log Performed
2007-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-04 Plug Back Performed
2007-11-04 Well Fluid changed to Crude Oil
2007-11-04 Well Log Performed
2007-11-04 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-13 Perforation 1929.40 1930.30 13
1982-09-11 Perforation 1923.30 1924.20 13
1982-09-11 Acid Treatment 1923.30 1924.20 0
1994-04-25 Cement Squeeze 1923.30 1924.20 0
1994-04-26 Perforation 1919.50 1922.00 17
1994-04-27 Acid Wash 1919.50 1922.00 0
1994-04-29 Perforation 1912.20 1915.90 17
1994-05-04 Cement Squeeze 1912.20 1915.90 0
1996-03-12 Cement Squeeze 1919.50 1922.00 0
1996-03-13 Perforation 1914.00 1916.00 17
1996-03-15 Perforation 1878.00 1879.50 17
1957-07-24 Acid Wash 1929.40 1930.30 0
1996-03-18 Acid Treatment 1878.00 1879.50 0
2007-11-04 Packing Device Capped w/Cement 1896.50 1904.50 0
1957-10-06 Cement Squeeze 1929.40 1930.30 0
1957-10-10 Bullet Perforation 1927.60 1928.20 20
1957-10-13 Acid Wash 1927.60 1928.20 0
1978-02-16 Cement Squeeze 1927.60 1928.20 0
1978-02-22 Perforation 1925.70 1926.60 13
1978-02-23 Acid Treatment 1925.70 1926.60 0
1982-09-08 Cement Squeeze 1925.70 1926.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1417 0.0 0.0 0.0
1997 5411 0.0 0.0 0.0

For data sources see[5]

References