X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241613000

Well Details

Well ID: 0404241613000
Loading map...
Location: 00/13-16-040-24W4/0
Location Alias: 00/13-16-40-24 W4M
Location Alias 2: 00/13-16-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 13-16-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0003166
License Date: 1951-07-11
License Status: Suspension
Spud Date: 1951-07-31
Final Drill Date: 1951-09-20
Well Total Depth: 1966.30 m
Surface Hole Latitude: 52.446891
Surface Hole Longitude: -113.408255

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-07-11 Obtained License
1951-08-11 Drill Stem Test Performed
1951-08-20 Drill Stem Test Performed
1951-08-21 Drill Stem Test Performed
1951-08-22 Drill Stem Test Performed
1951-08-23 Drill Stem Test Performed
1951-08-24 Drill Stem Test Performed
1951-08-26 Drill Stem Test Performed
1951-08-28 Drill Stem Test Performed
1951-09-02 Drill Stem Test Performed
1951-09-09 Drill Stem Test Performed
1951-09-11 Drill Stem Test Performed
1951-09-12 Drill Stem Test Performed
1951-09-15 Drill Stem Test Performed
1951-09-16 Drill Stem Test Performed
1951-09-20 Finished Drilling
1951-09-20 Well Mode changed to Drilled and Cased
1951-09-22 Production Casing Operation Performed
1951-09-25 Perforation Treatment Performed - Bullet Perforation
1951-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-09-27 Perforation Treatment Performed - Cement Squeeze
1951-09-29 Perforation Treatment Performed - Bullet Perforation
1951-10-01 Perforation Treatment Performed - Acid Wash - No Pressure
1951-10-02 Drill Stem Test Performed
1951-10-02 Perforation Treatment Performed - Acid Wash - No Pressure
1951-10-02 Perforation Treatment Performed - Bullet Perforation
1951-10-02 Perforation Treatment Performed - Cement Squeeze
1951-10-16 Perforation Treatment Performed - Bullet Perforation
1951-10-18 Perforation Treatment Performed - Acid Wash - No Pressure
1951-10-20 Perforation Treatment Performed - Cement Squeeze
1951-10-21 Perforation Treatment Performed - Bullet Perforation
1951-10-22 Perforation Treatment Performed - Acid Wash - No Pressure
1951-10-28 Well Began Production
1951-10-28 Well Fluid changed to Crude Oil
1951-10-28 Well Mode changed to Flowing
1957-04-08 Well Fluid changed to Crude Oil
1957-04-08 Well Mode changed to Suspended
1964-10-30 Well Fluid changed to Crude Oil
1964-10-30 Well Mode changed to Pumping
1965-02-08 Well Fluid changed to Crude Oil
1965-02-08 Well Mode changed to Suspended
1970-02-11 Perforation Treatment Performed - Cement Squeeze
1970-02-11 Well Fluid changed to Crude Oil
1970-02-11 Well Mode changed to Abandoned Zone
1970-02-14 Perforation Treatment Performed - Jet Perforation
1970-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-10 Perforation Treatment Performed - Jet Perforation
2000-01-30 Well Log Performed
2000-01-31 Perforation Treatment Performed - Jet Perforation
2000-01-31 Well Log Performed
2000-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-03 Perforation Treatment Performed - Jet Perforation
2000-02-03 Plug Back Performed
2000-02-03 Well Log Performed
2000-02-04 Perforation Treatment Performed - Remedial Casing
2000-02-05 Well Log Performed
2000-02-07 Perforation Treatment Performed - Jet Perforation
2000-02-07 Well Log Performed
2000-02-11 Perforation Treatment Performed - Fractured
2003-07-23 Well Log Performed
2019-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-22 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-25 Bullet Perforation 1879.10 1882.10 10
1951-10-18 Acid Wash 1898.60 1899.20 0
1951-10-20 Cement Squeeze 1898.60 1899.20 0
1951-10-21 Bullet Perforation 1896.80 1897.40 13
1951-10-22 Acid Wash 1896.80 1897.40 0
1970-02-11 Cement Squeeze 1896.80 1897.40 0
1970-02-14 Perforation 1624.00 1627.60 13
1970-05-21 Acid Treatment 1624.00 1627.60 0
1974-10-10 Perforation 1632.50 1634.90 7
1974-10-10 Perforation 1636.20 1638.00 7
1974-10-10 Perforation 1639.20 1641.00 7
1951-09-26 Acid Treatment 1879.10 1882.10 0
1974-10-10 Perforation 1642.30 1644.10 7
2000-01-31 Perforation 1628.20 1629.50 17
2000-02-03 Packing Device Capped w/Cement 1607.00 1615.00 0
2000-02-03 Perforation 800.00 800.50 24
2000-02-04 Remedial Casing Cementing 800.00 800.50 0
2000-02-07 Perforation 656.00 660.00 17
2000-02-11 Fracture 656.00 660.00 0
2019-10-22 Packing Device Capped w/Cement 643.00 651.50 0
1951-09-27 Cement Squeeze 1879.10 1882.10 0
1951-09-29 Bullet Perforation 1893.10 1896.20 13
1951-10-01 Acid Wash 1893.10 1896.20 0
1951-10-02 Bullet Perforation 1896.20 1898.90 0
1951-10-02 Acid Wash 1893.10 1898.90 0
1951-10-02 Cement Squeeze 1893.10 1898.90 0
1951-10-16 Bullet Perforation 1898.60 1899.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References