X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241615000

Well Details

Well ID: 0404241615000
Loading map...
Location: 00/15-16-040-24W4/0
Location Alias: 00/15-16-40-24 W4M
Location Alias 2: 00/15-16-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 15-16-40-24
Operator Name: Enhance Energy Inc.
License Number: 0006092
License Date: 1953-02-20
License Status: Issued
Spud Date: 1953-03-08
Final Drill Date: 1953-04-16
Well Total Depth: 1940.00 m
Surface Hole Latitude: 52.447352
Surface Hole Longitude: -113.397094

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-02-20 Obtained License
1953-04-07 Drill Stem Test Performed
1953-04-10 Production Casing Operation Performed
1953-04-14 Drill Stem Test Performed
1953-04-15 Drill Stem Test Performed
1953-04-16 Drill Stem Test Performed
1953-04-16 Finished Drilling
1953-04-16 Perforation Treatment Performed - Open-Hole Completion
1953-04-16 Well Mode changed to Drilled and Cased
1953-04-17 Drill Stem Test Performed
1953-04-20 Well Began Production
1953-04-20 Well Fluid changed to Crude Oil
1953-04-20 Well Mode changed to Flowing
1953-05-13 Perforation Treatment Performed - Jet Perforation
1958-05-13 Perforation Treatment Performed - Jet Perforation
1958-05-14 Perforation Treatment Performed - Cement Squeeze
1958-05-16 Perforation Treatment Performed - Cement Squeeze
1958-05-16 Well Fluid changed to Crude Oil
1958-05-16 Well Mode changed to Flowing
1958-05-19 Perforation Treatment Performed - Bullet Perforation
1958-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-26 Perforation Treatment Performed - Jet Perforation
1965-07-27 Perforation Treatment Performed - Cement Squeeze
1965-07-31 Perforation Treatment Performed - Jet Perforation
1965-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-26 Perforation Treatment Performed - Jet Perforation
1982-08-26 Well Fluid changed to Crude Oil
1982-08-26 Well Mode changed to Abandoned Zone
1982-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-31 Perforation Treatment Performed - Cement Squeeze
1982-09-02 Perforation Treatment Performed - Jet Perforation
1982-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-16 Perforation Treatment Performed - Cement Squeeze
1989-08-18 Perforation Treatment Performed - Jet Perforation
1989-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-13 Well Log Performed
1991-12-20 Perforation Treatment Performed - Cement Squeeze
1991-12-20 Plug Back Performed
1992-01-14 Perforation Treatment Performed - Open-Hole Completion
1992-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-22 Well Began Injection
1992-01-22 Well Fluid changed to Water
1992-01-22 Well Type changed to Disposal
1992-01-27 Well Log Performed
1995-01-10 Well Log Performed
1996-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-17 Well Log Performed
2007-03-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-04-16 Open Hole/Barefoot Completion 1919.60 1920.80 0
1965-07-31 Perforation 1919.00 1920.20 13
1965-08-02 Acid Treatment 1919.00 1920.20 0
1965-08-03 Acid Treatment 1919.00 1920.20 0
1982-08-26 Packing Device Capped w/Cement 1894.00 1901.00 0
1982-08-26 Perforation 1885.20 1886.40 13
1982-08-27 Acid Treatment 1885.20 1886.40 0
1982-08-31 Cement Squeeze 1885.20 1886.40 0
1982-09-02 Perforation 1884.00 1885.00 14
1982-09-03 Acid Treatment 1884.00 1885.00 0
1989-08-16 Cement Squeeze 1884.00 1885.00 0
1953-05-13 Perforation 1885.50 1886.40 13
1989-08-18 Perforation 1880.70 1881.70 14
1989-08-19 Acid Treatment 1880.70 1881.70 0
1991-12-20 Cement Squeeze 1880.70 1881.70 0
1992-01-14 Open Hole/Barefoot Completion 1919.60 1940.00 0
1992-01-16 Acid Treatment 1919.60 1940.00 0
1996-12-08 Acid Treatment 1919.60 1940.00 0
1958-05-13 Perforation 1916.00 1916.90 13
1958-05-14 Cement Squeeze 1916.00 1916.90 0
1958-05-16 Cement Squeeze 1885.50 1886.40 0
1958-05-19 Bullet Perforation 1919.60 1920.50 13
1958-05-20 Acid Treatment 1919.60 1920.50 0
1965-07-26 Perforation 1917.20 1918.40 0
1965-07-27 Cement Squeeze 1917.20 1918.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 468 0.0 0.0 0.0
1968 483 0.0 0.0 0.0
1969 759 0.0 0.0 0.0
1970 1082 0.0 0.0 0.0
1976 888 0.0 0.0 0.0
1977 7921 0.0 0.0 0.0
1978 7556 0.0 0.0 0.0
1979 6384 0.0 0.0 0.0
1981 4 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References