X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242009000

Well Details

Well ID: 0404242009000
Loading map...
Location: 00/09-20-040-24W4/0
Location Alias: 00/09-20-40-24 W4M
Location Alias 2: 00/09-20-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 20
County/Municipality: Lacombe County
Well Name: ULSTER CLIVE 9-20-40-24
Operator Name: Devon Aog Corporation
License Number: 0024661
License Date: 1963-08-13
License Status: RecCertified
Spud Date: 1963-08-16
Final Drill Date: 1963-08-29
Well Total Depth: 1912.60 m
Surface Hole Latitude: 52.458422
Surface Hole Longitude: -113.413334

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-13 Obtained License
1963-08-29 Finished Drilling
1963-08-29 Well Mode changed to Drilled and Cased
1963-08-30 Drill Stem Test Performed
1963-08-31 Drill Stem Test Performed
1963-09-01 Production Casing Operation Performed
1963-09-14 Perforation Treatment Performed - Acid Wash - No Pressure
1963-09-14 Perforation Treatment Performed - Bullet Perforation
1963-09-14 Perforation Treatment Performed - Cement Squeeze
1963-09-15 Perforation Treatment Performed - Acid Wash - No Pressure
1963-09-15 Perforation Treatment Performed - Bullet Perforation
1963-09-16 Well Began Production
1963-09-16 Well Fluid changed to Crude Oil
1963-09-16 Well Mode changed to Flowing
1968-04-06 Well Fluid changed to Crude Oil
1968-04-06 Well Mode changed to Pumping
1990-09-18 Well Log Performed
1990-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-19 Plug Back Performed
1990-09-19 Well Log Performed
1990-09-20 Perforation Treatment Performed - Jet Perforation
1990-09-20 Well Log Performed
1990-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-25 Perforation Treatment Performed - Bridge Plug No Cement Required
1990-09-25 Well Fluid changed to Crude Oil
1990-09-25 Well Mode changed to Abandoned
1990-09-26 Perforation Treatment Performed - Jet Perforation
1990-09-26 Perforation Treatment Performed - Remedial Casing
1990-09-27 Perforation Treatment Performed - Cement Plug
1990-10-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-14 Bullet Perforation 1899.80 1900.40 13
1990-09-25 Bridge Plug, No Cement 1850.00 1850.00 0
1990-09-26 Perforation 500.00 501.00 13
1990-09-26 Remedial Casing Cementing 500.00 501.00 0
1990-09-27 Cement Plug 409.00 501.00 0
1963-09-14 Bullet Perforation 1901.30 1902.00 13
1963-09-14 Acid Wash 1899.80 1902.00 0
1963-09-14 Cement Squeeze 1899.80 1902.00 0
1963-09-15 Bullet Perforation 1904.70 1905.30 13
1963-09-15 Acid Wash 1904.70 1905.30 0
1990-09-19 Packing Device Capped w/Cement 1879.50 1889.50 0
1990-09-20 Perforation 1869.60 1870.80 13
1990-09-24 Acid Treatment 1869.60 1870.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1070 0.0 0.0 0.0
1968 5568 0.0 0.0 0.0
1969 5995 0.0 0.0 0.0
1970 5570 0.0 0.0 0.0
1977 1035 0.0 0.0 0.0

For data sources see[5]

References