X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242103002

Well Details

Well ID: 0404242103002
Loading map...
Location: 00/03-21-040-24W4/2
Location Alias: 00/03-21-40-24 W4M
Location Alias 2: 00/03-21-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 3-21-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006060
License Date: 1953-02-12
License Status: Suspension
Spud Date: 1953-02-21
Final Drill Date: 1953-03-26
Well Total Depth: 1938.50 m
Surface Hole Latitude: 52.450926
Surface Hole Longitude: -113.402321

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-02-12 Obtained License
1953-03-20 Drill Stem Test Performed
1953-03-23 Drill Stem Test Performed
1953-03-24 Drill Stem Test Performed
1953-03-26 Finished Drilling
1953-03-26 Production Casing Operation Performed
1953-03-26 Well Mode changed to Drilled and Cased
1953-03-30 Perforation Treatment Performed - Bullet Perforation
1953-04-04 Well Began Production
1953-04-04 Well Fluid changed to Crude Oil
1953-04-04 Well Mode changed to Flowing
1957-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-03-08 Perforation Treatment Performed - Cement Squeeze
1957-03-08 Well Fluid changed to Crude Oil
1957-03-08 Well Mode changed to Abandoned Zone
1957-03-13 Perforation Treatment Performed - Bullet Perforation
1957-03-13 Perforation Treatment Performed - Jet Perforation
1957-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-11 Plug Back Performed
2000-02-11 Well Log Performed
2000-02-12 Perforation Treatment Performed - Jet Perforation
2000-02-12 Well Fluid changed to Crude Oil
2000-02-12 Well Log Performed
2000-02-12 Well Mode changed to Suspended
2000-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-04 Well Fluid changed to Crude Oil
2000-04-04 Well Mode changed to Pumping
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-03-30 Bullet Perforation 1884.00 1884.90 13
2000-02-12 Perforation 1872.50 1874.00 20
2000-02-12 Perforation 1880.00 1882.50 20
2000-02-14 Acid Treatment 1870.00 1871.00 0
2000-02-14 Acid Treatment 1872.50 1874.00 0
2000-02-14 Acid Treatment 1880.00 1882.50 0
1953-03-30 Bullet Perforation 1918.40 1919.30 13
1957-03-08 Acid Treatment 1884.00 1884.90 0
1957-03-08 Cement Squeeze 1884.00 1884.90 0
1957-03-13 Perforation 1918.40 1919.30 13
1957-03-13 Bullet Perforation 1918.40 1919.30 13
1957-03-15 Acid Treatment 1918.40 1919.30 0
2000-02-11 Packing Device Capped w/Cement 1905.00 1913.00 0
2000-02-12 Perforation 1870.00 1871.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
2000 6404 0.0 0.0 0.0
2001 8276 0.0 0.0 0.0
2002 7303 0.0 0.0 0.0

For data sources see[5]

References