X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242104002

Well Details

Well ID: 0404242104002
Loading map...
Location: 00/04-21-040-24W4/2
Location Alias: 00/04-21-40-24 W4M
Location Alias 2: 00/04-21-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 4-21-40-24
Operator Name: Enhance Energy Inc.
License Number: 0004432
License Date: 1952-03-27
License Status: Suspension
Spud Date: 1952-04-24
Final Drill Date: 1952-06-09
Well Total Depth: 1927.90 m
Surface Hole Latitude: 52.450512
Surface Hole Longitude: -113.408028

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-27 Obtained License
1952-05-08 Drill Stem Test Performed
1952-05-14 Drill Stem Test Performed
1952-05-15 Drill Stem Test Performed
1952-05-17 Drill Stem Test Performed
1952-05-30 Drill Stem Test Performed
1952-06-01 Drill Stem Test Performed
1952-06-02 Drill Stem Test Performed
1952-06-03 Drill Stem Test Performed
1952-06-04 Drill Stem Test Performed
1952-06-08 Drill Stem Test Performed
1952-06-09 Drill Stem Test Performed
1952-06-09 Finished Drilling
1952-06-09 Well Mode changed to Drilled and Cased
1952-06-11 Production Casing Operation Performed
1952-06-15 Perforation Treatment Performed - Selective Bullet Perforations
1952-06-18 Perforation Treatment Performed - Bullet Perforation
1952-06-18 Perforation Treatment Performed - Jet Perforation
1952-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-07-03 Well Began Production
1952-07-03 Well Fluid changed to Crude Oil
1952-07-03 Well Mode changed to Flowing
1956-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1959-06-15 Well Fluid changed to Crude Oil
1959-06-15 Well Mode changed to Pumping
1959-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-30 Well Fluid changed to Crude Oil
1996-04-30 Well Mode changed to Suspended
1999-06-29 Well Type changed to Observation
2005-10-18 Well Log Performed
2005-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-19 Plug Back Performed
2005-10-19 Well Mode changed to Abandoned Zone
2005-10-19 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-15 Selective Bullet Perforations 1921.80 1921.80 0
1952-06-18 Bullet Perforation 1880.60 1889.80 7
1952-06-18 Perforation 1880.60 1889.80 7
1952-06-25 Acid Treatment 1880.60 1889.80 0
1956-09-25 Acid Treatment 1880.60 1889.80 0
1956-09-27 Acid Treatment 1880.60 1889.80 0
1959-06-14 Packing Device Capped w/Cement 1893.10 1893.10 0
1959-07-01 Acid Treatment 1880.60 1889.80 0
2005-10-19 Packing Device Capped w/Cement 1862.00 1870.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5780 0.0 0.0 0.0
1968 7506 0.0 0.0 0.0
1969 5813 0.0 0.0 0.0
1970 3923 0.0 0.0 0.0
1975 2516 0.0 0.0 0.0
1977 1166 0.0 0.0 0.0
1978 5324 0.0 0.0 0.0
1979 4704 0.0 0.0 0.0

For data sources see[5]

References