If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0404242107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.453815,"lon":-113.396869,"icon":""}]} |
| Location: 00/07-21-040-24W4/0 | |
| Location Alias: 00/07-21-40-24 W4M | |
| Location Alias 2: 00/07-21-040-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 21 | |
| County/Municipality: Lacombe County | |
| Well Name: ENHANCEENERGY CLIVE 7-21-40-24 | |
| Operator Name: Enhance Energy Inc. | |
| License Number: 0006543 | |
| License Date: 1953-06-06 | |
| License Status: Issued | |
| Spud Date: 1953-06-12 | |
| Final Drill Date: 1953-07-15 | |
| Well Total Depth: 1968.10 m | |
| Surface Hole Latitude: 52.453815 | |
| Surface Hole Longitude: -113.396869 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1953-06-06 | Obtained License |
| 1953-06-28 | Drill Stem Test Performed |
| 1953-07-09 | Drill Stem Test Performed |
| 1953-07-12 | Drill Stem Test Performed |
| 1953-07-13 | Drill Stem Test Performed |
| 1953-07-14 | Drill Stem Test Performed |
| 1953-07-15 | Finished Drilling |
| 1953-07-18 | Perforation Treatment Performed - Jet Perforation |
| 1953-07-19 | Drill Stem Test Performed |
| 1953-07-19 | Liner Casing Operation Performed |
| 1953-07-22 | Perforation Treatment Performed - Bullet Perforation |
| 1953-07-22 | Perforation Treatment Performed - Jet Perforation |
| 1953-07-26 | Perforation Treatment Performed - Cement Squeeze |
| 1953-07-28 | Drill Stem Test Performed |
| 1953-07-28 | Perforation Treatment Performed - Bullet Perforation |
| 1953-10-21 | Well Mode changed to Drilled and Cased |
| 1957-08-30 | Well Fluid changed to Crude Oil |
| 1957-08-30 | Well Mode changed to Potential |
| 1957-08-31 | Perforation Treatment Performed - Cement Squeeze |
| 1957-08-31 | Well Fluid changed to Crude Oil |
| 1957-08-31 | Well Mode changed to Abandoned Zone |
| 1957-09-04 | Perforation Treatment Performed - Open-Hole Completion |
| 1957-09-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-07-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-03-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-05-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-04-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-04-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-05-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-10-09 | Perforation Treatment Performed - Fractured |
| 1991-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-01-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-12-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1999-10-08 | Well Log Performed |
| 1999-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-10-09 | Perforation Treatment Performed - Jet Perforation |
| 1999-10-09 | Plug Back Performed |
| 1999-10-09 | Well Log Performed |
| 1999-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1953-07-18 | Perforation | 1913.80 | 1914.40 | 13 |
| 1976-03-19 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1976-07-19 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1977-02-18 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1977-03-18 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1977-05-17 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1978-04-18 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1978-04-22 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1978-04-28 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1978-06-10 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1978-07-21 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1953-07-22 | Perforation | 1910.20 | 1913.80 | 13 |
| 1982-05-14 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1982-08-18 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1982-10-09 | Fracture | 1945.20 | 1968.10 | 0 |
| 1991-07-06 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1991-10-25 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1992-01-30 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1996-12-08 | Acid Wash | 1945.20 | 1968.10 | 0 |
| 1999-10-09 | Packing Device Capped w/Cement | 1927.00 | 1935.00 | 0 |
| 1999-10-09 | Perforation | 1874.40 | 1878.00 | 20 |
| 1999-10-10 | Acid Treatment | 1874.40 | 1878.00 | 0 |
| 1953-07-22 | Bullet Perforation | 1910.20 | 1913.80 | 13 |
| 1953-07-26 | Cement Squeeze | 1910.20 | 1913.80 | 0 |
| 1953-07-28 | Bullet Perforation | 1874.80 | 1876.00 | 13 |
| 1957-08-31 | Cement Squeeze | 1874.80 | 1914.40 | 0 |
| 1957-09-04 | Open Hole/Barefoot Completion | 1945.20 | 1968.10 | 0 |
| 1957-09-27 | Acid Treatment | 1945.20 | 1968.10 | 0 |
| 1976-02-14 | Acid Treatment | 1945.20 | 1968.10 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]