X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404243216002

Well Details

Well ID: 0404243216002
Loading map...
Location: 00/16-32-040-24W4/2
Location Alias: 00/16-32-40-24 W4M
Location Alias 2: 00/16-32-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 32
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 16-32-40-24
Operator Name: Enhance Energy Inc.
License Number: 0119005
License Date: 1985-11-06
License Status: Issued
Spud Date: 1985-11-16
Final Drill Date: 1985-12-04
Well Total Depth: 1895.00 m
Surface Hole Latitude: 52.489647
Surface Hole Longitude: -113.414619

For data sources see[1][2]

Well History

Date Event
1985-11-06 Obtained License
1985-11-17 Surface Casing Operation Performed
1985-11-25 Direction Drilling Operation Performed - Deviate
1985-12-04 Finished Drilling
1985-12-04 Well Mode changed to Drilled and Cased
1985-12-05 Well Log Performed
1985-12-06 Production Casing Operation Performed
1985-12-06 Rig Released
1985-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-21 Perforation Treatment Performed - Jet Perforation
1985-12-22 Perforation Treatment Performed - Jet Perforation
1985-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-05 Well Log Performed
1986-04-25 Well Began Production
1986-04-25 Well Fluid changed to Crude Oil
1986-04-25 Well Mode changed to Pumping
1993-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-01 Well Log Performed
1997-08-07 Well Log Performed
1997-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-09 Perforation Treatment Performed - Cement Squeeze
1997-08-09 Plug Back Performed
1997-08-12 Perforation Treatment Performed - Cement Squeeze
1997-08-16 Well Log Performed
1997-08-19 Liner Casing Operation Performed
1997-08-19 Perforation Treatment Performed - Cement Squeeze
1997-08-19 Well Fluid changed to Crude Oil
1997-08-19 Well Mode changed to Abandoned Zone
1997-08-20 Well Log Performed
1997-08-21 Perforation Treatment Performed - Jet Perforation
1997-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-24 Perforation Treatment Performed - Jet Perforation
1997-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-25 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-11-25 1361.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-21 Perforation 1861.00 1862.50 13
1997-08-19 Cement Squeeze 1810.00 1862.50 0
1997-08-21 Perforation 1869.00 1876.00 20
1997-08-22 Acid Treatment 1869.00 1876.00 0
1997-08-24 Perforation 1864.00 1869.00 20
1997-08-25 Acid Treatment 1864.00 1869.50 0
1985-12-21 Acid Treatment 1861.00 1862.50 0
1985-12-22 Perforation 1810.00 1813.00 13
1985-12-23 Acid Treatment 1810.00 1813.00 0
1993-07-15 Acid Treatment 1810.00 1813.00 0
1997-08-08 Acid Treatment 1861.00 1862.50 0
1997-08-09 Cement Squeeze 1861.00 1862.50 0
1997-08-09 Acid Treatment 1810.00 1813.00 0
1997-08-12 Cement Squeeze 1810.00 1813.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2623 0.0 0.0 0.0
1987 400 0.0 0.0 0.0
1988 192 0.0 0.0 0.0
1989 432 0.0 0.0 0.0
1993 2969 0.0 0.0 0.0

For data sources see[6]

References