X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404243312002

Well Details

Well ID: 0404243312002
Loading map...
Location: 00/12-33-040-24W4/2
Location Alias: 00/12-33-40-24 W4M
Location Alias 2: 00/12-33-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 33
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 12-33-40-24
Operator Name: Enhance Energy Inc.
License Number: 0034274
License Date: 1968-06-13
License Status: Issued
Spud Date: 1968-06-15
Final Drill Date: 1968-06-23
Well Total Depth: 1874.50 m
Surface Hole Latitude: 52.486152
Surface Hole Longitude: -113.408745

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-13 Obtained License
1968-06-23 Finished Drilling
1968-06-23 Well Mode changed to Drilled and Cased
1968-06-24 Drill Stem Test Performed
1968-06-26 Drill Stem Test Performed
1968-06-26 Production Casing Operation Performed
1968-07-06 Perforation Treatment Performed - Acid Wash - No Pressure
1968-07-06 Perforation Treatment Performed - Jet Perforation
1993-04-14 Perforation Treatment Performed - Cement Squeeze
1993-04-15 Perforation Treatment Performed - Jet Perforation
1993-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-16 Perforation Treatment Performed - Cement Squeeze
1993-04-20 Perforation Treatment Performed - Jet Perforation
1993-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-05 Perforation Treatment Performed - Jet Perforation
1997-05-05 Well Log Performed
1997-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-19 Perforation Treatment Performed - Jet Perforation
1999-05-19 Plug Back Performed
1999-05-19 Well Log Performed
1999-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-29 Well Began Production
1999-05-29 Well Fluid changed to Crude Oil
1999-05-29 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-07-06 Perforation 1854.10 1854.40 13
1997-05-06 Acid Treatment 1846.50 1852.00 0
1999-05-19 Packing Device Capped w/Cement 1832.00 1840.00 0
1999-05-19 Perforation 1811.00 1813.50 17
1999-05-20 Acid Treatment 1811.00 1813.50 0
1999-05-22 Acid Treatment 1811.00 1813.50 0
1968-07-06 Acid Wash 1854.10 1854.40 0
1993-04-14 Cement Squeeze 1854.10 1854.40 0
1993-04-15 Perforation 1850.00 1851.50 17
1993-04-16 Acid Treatment 1850.00 1851.50 0
1993-04-16 Cement Squeeze 1850.00 1851.50 0
1993-04-20 Perforation 1851.50 1852.50 17
1993-04-21 Acid Treatment 1851.50 1852.50 0
1997-05-05 Perforation 1846.50 1852.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4952 0.0 0.0 0.0
2000 8691 0.0 0.0 0.0
2001 8548 0.0 0.0 0.0
2002 8427 0.0 0.0 0.0
2003 8734 0.0 0.0 0.0
2004 8699 0.0 0.0 0.0
2005 8471 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8743 0.0 0.0 0.0
2008 8363 0.0 0.0 0.0
2009 8663 0.0 0.0 0.0
2010 8550 0.0 0.0 0.0
2011 6840 0.0 0.0 0.0
2012 7238 0.0 0.0 0.0
2013 7224 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8709 0.0 0.0 0.0
2016 8770 0.0 0.0 0.0
2017 3892 0.0 0.0 0.0

For data sources see[5]

References