If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0405022610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.474188,"lon":-114.178754,"icon":""}]} |
Location: 00/10-26-040-02W5/0 | |
Location Alias: 00/10-26-40-02 W5M | |
Location Alias 2: 00/10-26-040-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 5 | |
Range: 02 | |
Section: 26 | |
County/Municipality: Lacombe County | |
Well Name: CVE GILBY 10-26-40-2 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0015544 | |
License Date: 1958-07-11 | |
License Status: RecCertified | |
Spud Date: 1958-07-20 | |
Final Drill Date: 1958-08-01 | |
Well Total Depth: 1816.60 m | |
Surface Hole Latitude: 52.474188 | |
Surface Hole Longitude: -114.178754 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-07-11 | Obtained License |
1958-08-01 | Drill Stem Test Performed |
1958-08-01 | Finished Drilling |
1958-08-01 | Well Mode changed to Drilled and Cased |
1958-08-02 | Production Casing Operation Performed |
1958-08-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-08-04 | Perforation Treatment Performed - Bullet Perforation |
1958-08-11 | Perforation Treatment Performed - Fractured |
1958-08-17 | Well Began Production |
1958-08-17 | Well Fluid changed to Crude Oil |
1958-08-17 | Well Mode changed to Pumping |
1972-07-31 | Well Fluid changed to Crude Oil |
1972-07-31 | Well Mode changed to Suspended |
1973-02-06 | Perforation Treatment Performed - Cement Plug |
1973-09-17 | Perforation Treatment Performed - Cement Plug |
1973-09-17 | Well Abandoned |
1973-09-17 | Well Fluid changed to Crude Oil |
1973-09-17 | Well Mode changed to Abandoned |
1973-09-21 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-08-04 | Bullet Perforation | 1797.10 | 1799.80 | 26 |
1958-08-04 | Acid Treatment | 1797.10 | 1799.80 | 0 |
1958-08-11 | Fracture | 1797.10 | 1799.80 | 0 |
1973-02-06 | Cement Plug | 1761.70 | 1793.70 | 0 |
1973-09-17 | Cement Plug | 736.10 | 770.50 | 0 |
1973-09-21 | Cement Plug | 172.20 | 202.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 4033 | 0.0 | 0.0 | 0.0 |
1968 | 1032 | 0.0 | 0.0 | 0.0 |
1969 | 5616 | 0.0 | 0.0 | 0.0 |
1970 | 5586 | 0.0 | 0.0 | 0.0 |
1971 | 7488 | 0.0 | 0.0 | 0.0 |
1972 | 365 | 0.0 | 0.0 | 0.0 |
For data sources see[5]