X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405031916000

Well Details

Well ID: 0405031916000
Loading map...
Location: 00/16-19-040-03W5/0
Location Alias: 00/16-19-40-03 W5M
Location Alias 2: 00/16-19-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 19
County/Municipality: Lacombe County
Well Name: OMERS ENERGY GILBY 16-19-40-3
Operator Name: Gain Energy Ltd.
License Number: 0019415
License Date: 1960-07-21
License Status: Issued
Spud Date: 1960-08-14
Final Drill Date: 1960-08-31
Well Total Depth: 2194.60 m
Surface Hole Latitude: 52.462580
Surface Hole Longitude: -114.413286

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-21 Obtained License
1960-08-29 Drill Stem Test Performed
1960-08-30 Drill Stem Test Performed
1960-08-31 Finished Drilling
1960-08-31 Well Mode changed to Drilled and Cased
1960-09-01 Drill Stem Test Performed
1960-09-02 Production Casing Operation Performed
1960-09-04 Perforation Treatment Performed - Jet Perforation
1960-09-05 Perforation Treatment Performed - Jet Perforation
1960-09-05 Well Began Production
1960-09-05 Well Fluid changed to Crude Oil
1960-09-05 Well Mode changed to Pumping
1970-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-24 Perforation Treatment Performed - Jet Perforation
1972-08-01 Well Fluid changed to Crude Oil
1972-08-01 Well Mode changed to Pumping
1981-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-22 Perforation Treatment Performed - Cement Squeeze
1991-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-15 Perforation Treatment Performed - Jet Perforation
2003-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-09-04 Perforation 2171.70 2173.20 13
1970-07-24 Perforation 2111.70 2112.90 7
1970-07-24 Acid Treatment 2101.30 2112.90 0
1981-04-24 Acid Treatment 2101.30 2112.90 0
1981-05-22 Acid Treatment 2101.30 2112.90 0
1981-05-23 Acid Treatment 2101.30 2112.90 0
1991-06-22 Cement Squeeze 2101.30 2112.90 0
1991-07-03 Acid Treatment 2140.30 2147.30 0
1993-03-03 Acid Treatment 2140.30 2147.30 0
1994-09-15 Perforation 2133.00 2138.20 14
2003-03-19 Acid Treatment 2140.30 2147.30 0
1960-09-04 Perforation 2163.50 2165.00 13
1960-09-05 Perforation 2144.30 2147.30 13
1960-09-05 Perforation 2142.40 2143.40 13
1960-09-05 Perforation 2140.30 2141.80 13
1970-07-24 Perforation 2101.30 2103.10 7
1970-07-24 Perforation 2104.90 2105.60 7
1970-07-24 Perforation 2106.20 2106.80 7
1970-07-24 Perforation 2109.50 2111.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4466 0.0 0.0 0.0
1968 5980 0.0 0.0 0.0
1969 5007 0.0 0.0 0.0
1970 1891 0.0 0.0 0.0
1972 3258 0.0 0.0 0.0
1973 1729 0.0 0.0 0.0
1974 4113 0.0 0.0 0.0
1975 4326 0.0 0.0 0.0
1976 8321 0.0 0.0 0.0
1977 8003 0.0 0.0 0.0
1978 8228 0.0 0.0 0.0
1979 3250 0.0 0.0 0.0
1980 7918 0.0 0.0 0.0
1981 6235 0.0 0.0 0.0
1982 7970 0.0 0.0 0.0
1983 7754 0.0 0.0 0.0
1984 8488 0.0 0.0 0.0
1985 8413 0.0 0.0 0.0
1986 8555 0.0 0.0 0.0
1987 8496 0.0 0.0 0.0
1988 7910 0.0 0.0 0.0
1989 8620 0.0 0.0 0.0
1990 8019 0.0 0.0 0.0
1991 7572 0.0 0.0 0.0
1992 8586 0.0 0.0 0.0
1993 8127 0.0 0.0 0.0
1994 7836 0.0 0.0 0.0
1995 8192 0.0 0.0 0.0
1996 7744 0.0 0.0 0.0
1997 8713 0.0 0.0 0.0
1998 8584 0.0 0.0 0.0
1999 8315 0.0 0.0 0.0
2000 8332 0.0 0.0 0.0
2001 8032 0.0 0.0 0.0
2002 8193 0.0 0.0 0.0
2003 8152 0.0 0.0 0.0
2004 8400 0.0 0.0 0.0
2005 8537 0.0 0.0 0.0
2006 8690 0.0 0.0 0.0
2007 8424 0.0 0.0 0.0
2008 8512 0.0 0.0 0.0
2009 8392 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8716 0.0 0.0 0.0
2012 7071 0.0 0.0 0.0
2013 7766 0.0 0.0 0.0
2014 8203 0.0 0.0 0.0
2015 8658 0.0 0.0 0.0
2016 8093 0.0 0.0 0.0
2017 6004 0.0 0.0 0.0
2018 8584 0.0 0.0 0.0
2019 154 0.0 0.0 0.0

For data sources see[5]

References