X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405041302000

Well Details

Well ID: 0405041302000
Loading map...
Location: 00/02-13-040-04W5/0
Location Alias: 00/02-13-40-04 W5M
Location Alias 2: 00/02-13-040-04 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 13
County/Municipality: Lacombe County
Well Name: JOURNEY GILBY 2-13-40-4
Operator Name: Journey Energy Inc.
License Number: 0027782
License Date: 1965-02-17
License Status: Suspension
Spud Date: 1965-02-25
Final Drill Date: 1965-03-14
Well Total Depth: 2234.50 m
Surface Hole Latitude: 52.437635
Surface Hole Longitude: -114.442246

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-17 Obtained License
1965-02-25 Lost Circulation Occurred
1965-03-10 Drill Stem Test Performed
1965-03-14 Finished Drilling
1965-03-14 Well Mode changed to Drilled and Cased
1965-03-15 Production Casing Operation Performed
1965-03-27 Perforation Treatment Performed - Jet Perforation
1965-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-09 Well Began Production
1965-04-09 Well Fluid changed to Crude Oil
1965-04-09 Well Mode changed to Pumping
1970-09-10 Perforation Treatment Performed - Jet Perforation
1970-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-11 Perforation Treatment Performed - Fractured
1970-09-14 Well Fluid changed to Crude Oil
1970-09-14 Well Mode changed to Pumping
1971-05-13 Perforation Treatment Performed - Chemical Squeeze
1978-01-12 Well Fluid changed to Crude Oil
1978-01-12 Well Mode changed to Suspended
2001-11-14 Well Log Performed
2001-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-15 Perforation Treatment Performed - Cement Plug
2001-11-15 Perforation Treatment Performed - Cement Squeeze
2001-11-15 Plug Back Performed
2001-11-15 Well Fluid changed to Crude Oil
2001-11-15 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-27 Perforation 2175.10 2176.30 10
2001-11-15 Packing Device Capped w/Cement 2151.00 2167.00 0
2001-11-15 Cement Squeeze 2146.70 2151.00 0
2001-11-15 Cement Plug 2114.20 2146.70 0
1965-03-27 Perforation 2179.30 2180.50 10
1965-03-30 Acid Treatment 2175.10 2176.30 0
1965-03-30 Acid Treatment 2179.30 2180.50 0
1970-09-10 Perforation 2147.00 2151.30 13
1970-09-11 Acid Treatment 2147.00 2151.30 0
1970-09-11 Fracture 2147.00 2151.30 0
1971-05-13 Chemical Squeeze 2147.00 2151.30 0
2001-11-15 Cement Squeeze 2174.90 2180.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7379 0.0 0.0 0.0
1968 7512 0.0 0.0 0.0
1969 5363 0.0 0.0 0.0
1970 7266 0.0 0.0 0.0
1971 8647 0.0 0.0 0.0
1972 8083 0.0 0.0 0.0
1973 7007 0.0 0.0 0.0
1974 2640 0.0 0.0 0.0
1975 2534 0.0 0.0 0.0
1976 7680 0.0 0.0 0.0
1977 5566 0.0 0.0 0.0
1978 356 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-02-25 Lost Circulation 61.00 61.00

For data sources see[6]

References