X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405042506002

Well Details

Well ID: 0405042506002
Loading map...
Location: 00/06-25-040-04W5/2
Location Alias: 00/06-25-40-04 W5M
Location Alias 2: 00/06-25-040-04 W5/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 25
County/Municipality: Lacombe County
Well Name: OMERS ENERGY GILBY 6-25-40-4
Operator Name: Gain Energy Ltd.
License Number: 0023248
License Date: 1962-10-31
License Status: Suspension
Spud Date: 1962-11-01
Final Drill Date: 1962-11-15
Well Total Depth: 2203.70 m
Surface Hole Latitude: 52.470428
Surface Hole Longitude: -114.448729

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-10-31 Obtained License
1962-11-10 Drill Stem Test Performed
1962-11-15 Finished Drilling
1962-11-15 Well Mode changed to Drilled and Cased
1962-11-17 Production Casing Operation Performed
1962-11-19 Perforation Treatment Performed - Jet Perforation
1962-11-20 Perforation Treatment Performed - Cement Squeeze
1962-11-23 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-06 Perforation Treatment Performed - Jet Perforation
1962-12-09 Perforation Treatment Performed - Jet Perforation
1962-12-11 Perforation Treatment Performed - Cement Squeeze
1962-12-18 Perforation Treatment Performed - Cement Squeeze
1962-12-30 Perforation Treatment Performed - Bullet Perforation
1962-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-03 Perforation Treatment Performed - Cement Squeeze
1963-01-05 Perforation Treatment Performed - Bullet Perforation
1963-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-07 Perforation Treatment Performed - Fractured
1967-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-17 Perforation Treatment Performed - Cement Plug
1967-04-17 Perforation Treatment Performed - Jet Perforation
1967-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-21 Well Began Injection
1967-04-21 Well Fluid changed to Water
1967-04-21 Well Type changed to Injection
1968-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-17 Well Fluid changed to Water
1995-05-17 Well Mode changed to Suspended
1995-05-17 Well Type changed to Injection
2007-07-16 Perforation Treatment Performed - Cement Plug
2007-07-16 Plug Back Performed
2007-07-16 Well Fluid changed to Water
2007-07-16 Well Mode changed to Abandoned Zone
2007-07-16 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-11-19 Perforation 2164.10 2164.70 13
1962-12-02 Hydra Jet Perforation 2157.40 2158.00 0
1962-12-02 Hydra Jet Perforation 2158.60 2159.20 0
1962-12-02 Acid Treatment 2154.90 2159.20 0
1962-12-06 Perforation 2135.10 2135.70 13
1962-12-09 Perforation 2129.90 2130.60 13
1962-12-11 Cement Squeeze 2129.90 2130.60 0
1962-12-18 Cement Squeeze 2135.10 2135.70 0
1962-12-30 Bullet Perforation 2155.20 2157.40 20
1962-12-31 Acid Treatment 2155.20 2157.40 0
1963-01-03 Cement Squeeze 2155.20 2157.40 0
1962-11-20 Cement Squeeze 2164.10 2164.70 0
1963-01-05 Bullet Perforation 2173.20 2179.30 10
1963-01-06 Acid Treatment 2173.20 2179.30 0
1963-01-07 Fracture 2173.20 2179.30 0
1967-04-16 Acid Treatment 2173.20 2179.30 0
1967-04-17 Cement Plug 2168.30 2170.20 0
1967-04-17 Perforation 2154.60 2156.20 7
1967-04-17 Perforation 2157.10 2157.40 0
1967-04-17 Perforation 2158.60 2159.80 0
1967-04-17 Perforation 2161.00 2163.50 0
1967-04-18 Acid Treatment 2154.60 2163.50 0
1962-11-23 Hydra Jet Perforation 2154.30 2154.90 0
1968-02-29 Acid Treatment 2154.60 2163.50 0
1968-10-24 Acid Treatment 2154.60 2163.50 0
2007-07-16 Cement Plug 2029.00 2168.30 0
1962-11-23 Hydra Jet Perforation 2155.90 2156.50 0
1962-11-23 Hydra Jet Perforation 2157.10 2158.60 0
1962-11-23 Hydra Jet Perforation 2159.20 2159.20 0
1962-11-23 Acid Treatment 2154.30 2159.20 0
1962-12-02 Hydra Jet Perforation 2154.90 2155.50 0
1962-12-02 Hydra Jet Perforation 2156.20 2156.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References