X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414210410000

Well Details

Well ID: 0414210410000
Loading map...
Location: 00/10-04-041-21W4/0
Location Alias: 00/10-04-41-21 W4M
Location Alias 2: 00/10-04-041-21 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 21
Section: 04
County/Municipality: Lacombe County
Well Name: EMBER BASHAW 10-4-41-21
Operator Name: Ember Resources Inc.
License Number: 0327991
License Date: 2005-03-14
License Status: Issued
Spud Date: 2005-10-23
Final Drill Date: 2006-01-09
Well Total Depth: 671.00 m
Surface Hole Latitude: 52.502738
Surface Hole Longitude: -112.966140

For data sources see[1][2]

Well History

Date Event
2005-03-14 Obtained License
2005-10-23 Surface Casing Operation Performed
2006-01-09 Finished Drilling
2006-01-09 Production Casing Operation Performed
2006-01-09 Rig Released
2006-01-09 Well Log Performed
2006-01-09 Well Mode changed to Drilled and Cased
2006-02-28 Perforation Treatment Performed - Jet Perforation
2006-02-28 Well Log Performed
2006-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-09 Perforation Treatment Performed - Jet Perforation
2006-03-09 Plug Back Performed
2006-03-09 Well Mode changed to Abandoned Zone
2006-03-16 Perforation Treatment Performed - Fractured
2008-01-11 Perforation Treatment Performed - Jet Perforation
2008-01-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-28 Perforation 508.00 509.00 17
2006-03-09 Perforation 230.00 233.00 13
2006-03-09 Perforation 222.00 223.00 13
2006-03-09 Perforation 219.50 220.00 13
2006-03-09 Perforation 215.00 216.00 13
2006-03-09 Perforation 213.00 214.00 13
2006-03-09 Perforation 207.00 208.00 13
2006-03-16 Fracture 290.00 308.50 0
2006-03-16 Fracture 207.00 265.30 0
2008-01-11 Perforation 378.30 379.30 20
2008-01-11 Perforation 249.00 252.00 20
2006-03-09 Packing Device Capped w/Cement 497.00 505.00 0
2008-01-19 Fracture 378.30 379.30 0
2008-01-19 Fracture 249.00 252.00 0
2006-03-09 Perforation 307.50 308.50 13
2006-03-09 Perforation 302.50 303.50 13
2006-03-09 Perforation 290.00 290.50 13
2006-03-09 Perforation 263.30 265.30 13
2006-03-09 Perforation 257.50 260.50 13
2006-03-09 Perforation 239.00 240.00 13
2006-03-09 Perforation 234.00 235.00 13

For data sources see[4]



References