X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414222214000

Well Details

Well ID: 0414222214000
Loading map...
Location: 00/14-22-041-22W4/0
Location Alias: 00/14-22-41-22 W4M
Location Alias 2: 00/14-22-041-22 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 22
Section: 22
County/Municipality: Lacombe County
Well Name: EMBER BASHAW 14-22-41-22
Operator Name: Ember Resources Inc.
License Number: 0421137
License Date: 2010-06-11
License Status: Issued
Spud Date: 2010-10-02
Final Drill Date: 2010-10-12
Well Total Depth: 729.00 m
Surface Hole Latitude: 52.547908
Surface Hole Longitude: -113.088386

For data sources see[1][2]

Well History

Date Event
2010-06-11 Obtained License
2010-10-03 Surface Casing Operation Performed
2010-10-12 Finished Drilling
2010-10-12 Production Casing Operation Performed
2010-10-12 Rig Released
2010-10-12 Well Mode changed to Drilled and Cased
2010-10-15 Well Log Performed
2010-11-08 Perforation Treatment Performed - Jet Perforation
2010-11-09 Well Fluid changed to Gas
2010-11-09 Well Mode changed to Testing
2010-12-05 Well Began Production
2010-12-05 Well Fluid changed to Gas
2010-12-05 Well Mode changed to Flowing
2011-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-19 Plug Back Performed
2011-07-19 Well Fluid changed to Gas
2011-07-19 Well Mode changed to Abandoned Zone
2011-08-04 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-08 Perforation 593.00 595.00 20
2010-11-08 Perforation 324.20 325.20 13
2010-11-08 Perforation 307.80 309.30 13
2010-11-08 Perforation 300.00 302.50 13
2010-11-08 Perforation 296.10 297.60 13
2010-11-08 Perforation 284.30 285.80 13
2010-11-08 Perforation 277.70 278.70 13
2010-11-08 Perforation 271.60 273.10 13
2010-11-08 Perforation 263.30 264.80 13
2010-11-08 Perforation 234.80 237.30 13
2010-11-08 Perforation 221.80 224.30 13
2010-11-08 Perforation 589.00 592.00 20
2010-11-08 Perforation 189.30 190.80 13
2010-11-08 Perforation 349.00 352.00 13
2010-11-08 Perforation 335.80 337.80 13
2010-11-08 Perforation 230.00 231.00 13
2010-11-08 Perforation 210.00 213.00 13
2011-07-19 Packing Device Capped w/Cement 574.50 582.80 0
2011-08-04 Fracture 222.00 399.50 0
2011-08-04 Fracture 210.00 350.00 0
2010-11-08 Perforation 398.30 399.80 13
2010-11-08 Perforation 391.30 393.30 13
2010-11-08 Perforation 379.00 380.50 13
2010-11-08 Perforation 373.80 375.30 13
2010-11-08 Perforation 362.90 364.40 13
2010-11-08 Perforation 343.00 346.50 13
2010-11-08 Perforation 338.80 341.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 396 0.0 0.0 0.0
2011 1 0.0 0.0 0.0

For data sources see[5]

References