X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414223116000

Well Details

Well ID: 0414223116000
Loading map...
Location: 00/16-31-041-22W4/0
Location Alias: 00/16-31-41-22 W4M
Location Alias 2: 00/16-31-041-22 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 22
Section: 31
County/Municipality: Lacombe County
Well Name: SUPREME BASHAW 16-31-41-22
Operator Name: Supreme Energy Inc.
License Number: 0002783
License Date: 1951-04-18
License Status: Issued
Spud Date: 1951-05-27
Final Drill Date: 1951-07-27
Well Total Depth: 1773.30 m
Surface Hole Latitude: 52.577367
Surface Hole Longitude: -113.150835

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-04-18 Obtained License
1951-06-26 Drill Stem Test Performed
1951-06-27 Drill Stem Test Performed
1951-07-20 Drill Stem Test Performed
1951-07-25 Drill Stem Test Performed
1951-07-26 Drill Stem Test Performed
1951-07-27 Finished Drilling
1951-07-27 Lost Circulation Occurred
1951-07-27 Well Mode changed to Drilled and Cased
1951-07-30 Production Casing Operation Performed
1951-08-06 Perforation Treatment Performed - Bullet Perforation
1951-08-06 Well Began Production
1951-08-06 Well Fluid changed to Crude Oil
1951-08-06 Well Mode changed to Flowing
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1993-04-28 Well Log Performed
1993-04-30 Perforation Treatment Performed - Cement Squeeze
1993-05-03 Well Log Performed
1993-05-04 Perforation Treatment Performed - Jet Perforation
2001-05-26 Perforation Treatment Performed - Cement Squeeze
2001-05-29 Perforation Treatment Performed - Jet Perforation
2001-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-06 Bullet Perforation 1772.40 1773.00 13
1993-04-30 Cement Squeeze 1772.40 1773.00 0
1993-05-04 Perforation 1770.40 1770.90 18
2001-05-26 Cement Squeeze 1770.40 1770.90 0
2001-05-29 Perforation 1768.50 1769.00 17
2001-05-30 Acid Treatment 1768.50 1769.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5120 0.0 0.0 0.0
1968 5381 0.0 0.0 0.0
1969 3750 0.0 0.0 0.0
1970 2938 0.0 0.0 0.0
1971 3020 0.0 0.0 0.0
1972 4171 0.0 0.0 0.0
1973 4073 0.0 0.0 0.0
1974 2334 0.0 0.0 0.0
1975 2880 0.0 0.0 0.0
1976 1029 0.0 0.0 0.0
1977 1371 0.0 0.0 0.0
1978 4651 0.0 0.0 0.0
1979 6120 0.0 0.0 0.0
1980 6127 0.0 0.0 0.0
1981 6094 0.0 0.0 0.0
1982 6930 0.0 0.0 0.0
1983 7436 0.0 0.0 0.0
1984 8229 0.0 0.0 0.0
1985 7873 0.0 0.0 0.0
1986 8602 0.0 0.0 0.0
1987 8431 0.0 0.0 0.0
1988 8594 0.0 0.0 0.0
1989 8456 0.0 0.0 0.0
1990 8757 0.0 0.0 0.0
1991 8163 0.0 0.0 0.0
1992 8407 0.0 0.0 0.0
1993 7913 0.0 0.0 0.0
1994 8662 0.0 0.0 0.0
1995 8441 0.0 0.0 0.0
1996 8596 0.0 0.0 0.0
1997 7139 0.0 0.0 0.0
1998 8160 0.0 0.0 0.0
1999 8303 0.0 0.0 0.0
2000 8702 0.0 0.0 0.0
2001 8152 0.0 0.0 0.0
2002 5706 0.0 0.0 0.0
2003 6296 0.0 0.0 0.0
2004 8241 0.0 0.0 0.0
2005 7499 0.0 0.0 0.0
2006 5081 0.0 0.0 0.0
2007 8096 0.0 0.0 0.0
2008 7550 0.0 0.0 0.0
2009 8719 0.0 0.0 0.0
2010 8629 0.0 0.0 0.0
2011 8732 0.0 0.0 0.0
2012 7709 0.0 0.0 0.0
2013 8640 0.0 0.0 0.0
2014 8067 0.0 0.0 0.0
2015 8555 0.0 0.0 0.0
2016 6418 0.0 0.0 0.0
2017 740 0.0 0.0 0.0
2019 5525 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1951-07-27 Lost Circulation 1528.60 1528.60

For data sources see[6]

References