X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414231708000

Well Details

Well ID: 0414231708000
Loading map...
Location: 00/08-17-041-23W4/0
Location Alias: 00/08-17-41-23 W4M
Location Alias 2: 00/08-17-041-23 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 23
Section: 17
County/Municipality: Lacombe County
Well Name: AZTEK BASHAW 8-17-41-23
Operator Name: Tourmaline Oil Corp.
License Number: 0110076
License Date: 1984-10-19
License Status: Suspension
Spud Date: 1984-11-04
Final Drill Date: 1984-11-14
Well Total Depth: 1843.00 m
Surface Hole Latitude: 52.527182
Surface Hole Longitude: -113.272931

For data sources see[1][2]

Well History

Date Event
1984-10-19 Obtained License
1984-11-05 Surface Casing Operation Performed
1984-11-14 Finished Drilling
1984-11-14 Well Log Performed
1984-11-15 Drill Stem Test Performed
1984-11-16 Drill Stem Test Performed
1984-11-17 Drill Stem Test Performed
1984-11-18 Production Casing Operation Performed
1984-11-18 Rig Released
1984-11-24 Well Log Performed
1984-11-25 Perforation Treatment Performed - Jet Perforation
1984-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-07 Plug Back Performed
1985-05-08 Perforation Treatment Performed - Jet Perforation
1985-05-09 Well Mode changed to Drilled and Cased
1985-11-07 Well Began Production
1985-11-07 Well Fluid changed to Gas
1985-11-07 Well Mode changed to Flowing
1985-11-15 Well Log Performed
1986-05-23 Perforation Treatment Performed - Jet Perforation
1986-05-23 Well Log Performed
1986-10-03 Well Fluid changed to Gas
1986-10-03 Well Mode changed to Suspended
2003-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-31 Perforation Treatment Performed - Jet Perforation
2003-08-31 Plug Back Performed
2003-08-31 Well Fluid changed to Gas
2003-08-31 Well Mode changed to Abandoned Zone
2019-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-11 Perforation Treatment Performed - Cement Squeeze
2019-01-11 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-25 Perforation 1818.50 1820.50 13
2019-01-11 Packing Device Capped w/Cement 555.50 568.00 0
1984-11-28 Acid Treatment 1818.50 1820.50 0
1985-05-07 Packing Device Capped w/Cement 1806.00 1814.00 0
1985-05-08 Perforation 1550.00 1552.50 13
1986-05-23 Perforation 1553.00 1555.00 13
2003-08-31 Packing Device Capped w/Cement 1545.00 1545.50 0
2003-08-31 Perforation 617.00 620.00 13
2003-08-31 Perforation 576.00 578.00 13
2019-01-11 Cement Squeeze 576.00 620.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1218 0.0 0.0 0.0
1986 4937 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References