If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414231916002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.54811,"lon":-113.294981,"icon":""}]} |
Location: 00/16-19-041-23W4/2 | |
Location Alias: 00/16-19-41-23 W4M | |
Location Alias 2: 00/16-19-041-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 23 | |
Section: 19 | |
County/Municipality: Lacombe County | |
Well Name: EMBER BASHAW 16-19-41-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0331171 | |
License Date: 2005-05-17 | |
License Status: Issued | |
Spud Date: 2005-07-25 | |
Final Drill Date: 2005-07-26 | |
Well Total Depth: 826.00 m | |
Surface Hole Latitude: 52.548110 | |
Surface Hole Longitude: -113.294981 |
Date | Event |
---|---|
2005-05-17 | Obtained License |
2005-07-26 | Finished Drilling |
2005-07-26 | Surface Casing Operation Performed |
2005-07-26 | Well Mode changed to Drilled and Cased |
2005-07-27 | Production Casing Operation Performed |
2005-07-27 | Rig Released |
2005-08-14 | Well Log Performed |
2005-09-16 | Perforation Treatment Performed - Jet Perforation |
2005-09-18 | Perforation Treatment Performed - Fractured |
2005-10-03 | Well Began Production |
2005-10-03 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-10-03 | Well Mode changed to Flowing |
2006-06-21 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-06-21 | Well Mode changed to Flowing |
2008-06-27 | Perforation Treatment Performed - Jet Perforation |
2008-06-27 | Well Log Performed |
2008-09-23 | Perforation Treatment Performed - Jet Perforation |
2008-09-23 | Well Log Performed |
2017-03-08 | Well Fluid changed to Coalbed Methane-Coals Only |
2017-03-08 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-16 | Perforation | 627.00 | 628.30 | 13 |
2005-09-16 | Perforation | 488.00 | 489.00 | 13 |
2005-09-16 | Perforation | 495.20 | 496.20 | 13 |
2005-09-16 | Perforation | 496.80 | 497.80 | 13 |
2005-09-16 | Perforation | 500.50 | 501.00 | 13 |
2005-09-16 | Perforation | 377.50 | 378.00 | 13 |
2005-09-16 | Perforation | 385.00 | 386.00 | 13 |
2005-09-16 | Perforation | 395.50 | 396.50 | 13 |
2005-09-16 | Perforation | 397.00 | 398.00 | 13 |
2005-09-16 | Perforation | 399.00 | 399.50 | 13 |
2005-09-16 | Perforation | 400.50 | 401.00 | 13 |
2005-09-16 | Perforation | 640.00 | 641.10 | 13 |
2005-09-16 | Perforation | 402.80 | 403.30 | 13 |
2005-09-16 | Perforation | 428.00 | 428.50 | 13 |
2005-09-16 | Perforation | 430.00 | 431.00 | 13 |
2005-09-16 | Perforation | 441.00 | 442.00 | 13 |
2005-09-16 | Perforation | 449.50 | 450.00 | 13 |
2005-09-16 | Perforation | 453.50 | 455.00 | 13 |
2005-09-16 | Perforation | 456.50 | 457.00 | 13 |
2005-09-16 | Perforation | 458.50 | 459.50 | 13 |
2005-09-18 | Fracture | 627.00 | 752.80 | 0 |
2005-09-18 | Fracture | 471.50 | 501.00 | 0 |
2005-09-16 | Perforation | 685.00 | 685.50 | 13 |
2005-09-18 | Fracture | 377.50 | 459.50 | 0 |
2008-06-27 | Perforation | 517.00 | 519.00 | 17 |
2008-06-27 | Perforation | 573.00 | 576.00 | 17 |
2008-09-23 | Perforation | 790.00 | 791.50 | 14 |
2005-09-16 | Perforation | 712.90 | 714.00 | 13 |
2005-09-16 | Perforation | 719.20 | 719.60 | 13 |
2005-09-16 | Perforation | 739.00 | 739.80 | 13 |
2005-09-16 | Perforation | 752.30 | 752.80 | 13 |
2005-09-16 | Perforation | 471.50 | 472.00 | 13 |
2005-09-16 | Perforation | 473.50 | 474.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2148 | 0.0 | 0.0 | 0.0 |
2006 | 8678 | 0.0 | 0.0 | 0.0 |
2007 | 8735 | 0.0 | 0.0 | 0.0 |
2008 | 8655 | 0.0 | 0.0 | 0.0 |
2009 | 8658 | 0.0 | 0.0 | 0.0 |
2010 | 8715 | 0.0 | 0.0 | 0.0 |
2011 | 8723 | 0.0 | 0.0 | 0.0 |
2012 | 8732 | 0.0 | 0.0 | 0.0 |
2013 | 8701 | 0.0 | 0.0 | 0.0 |
2014 | 8707 | 0.0 | 0.0 | 0.0 |
2015 | 8751 | 0.0 | 0.0 | 0.0 |
2016 | 8777 | 0.0 | 0.0 | 0.0 |
2017 | 8727 | 0.0 | 0.0 | 0.0 |
2018 | 8699 | 0.0 | 0.0 | 0.0 |
2019 | 8403 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]