X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414232314000

Well Details

Well ID: 0414232314000
Loading map...
Location: 00/14-23-041-23W4/0
Location Alias: 00/14-23-41-23 W4M
Location Alias 2: 00/14-23-041-23 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 23
Section: 23
County/Municipality: Lacombe County
Well Name: RALLYCANADA BASHAW 14-23-41-23
Operator Name: Rally Canada Resources Ltd.
License Number: 0151658
License Date: 1992-02-10
License Status: Issued
Spud Date: 1992-02-22
Final Drill Date: 1992-03-04
Well Total Depth: 1785.00 m
Surface Hole Latitude: 52.546849
Surface Hole Longitude: -113.208227

For data sources see[1][2]

Well History

Date Event
1992-02-10 Obtained License
1992-02-23 Perforation Treatment Performed - Jet Perforation
1992-02-23 Surface Casing Operation Performed
1992-03-04 Finished Drilling
1992-03-04 Well Log Performed
1992-03-04 Well Mode changed to Drilled and Cased
1992-03-05 Production Casing Operation Performed
1992-03-05 Well Log Performed
1992-03-06 Rig Released
1992-03-22 Well Log Performed
1992-03-23 Perforation Treatment Performed - Jet Perforation
1992-03-23 Well Log Performed
1992-04-10 Well Began Production
1992-04-10 Well Fluid changed to Crude Oil
1992-04-10 Well Mode changed to Pumping
1993-06-11 Perforation Treatment Performed - Jet Perforation
1993-06-11 Well Log Performed
1993-06-14 Perforation Treatment Performed - Chemical Squeeze
1993-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-12 Well Began Injection
1993-07-12 Well Fluid changed to Water
1993-07-12 Well Type changed to Injection
1998-06-09 Perforation Treatment Performed - Jet Perforation
1998-06-09 Well Log Performed
1998-06-10 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-23 Perforation 1735.00 1736.50 13
1992-03-23 Perforation 1739.00 1744.00 13
1993-06-11 Perforation 1735.00 1736.60 17
1993-06-11 Perforation 1739.00 1744.00 17
1993-06-14 Chemical Squeeze 1735.00 1744.00 0
1993-06-15 Acid Treatment 1735.00 1744.00 0
1998-06-09 Perforation 335.00 335.20 2
1998-06-10 Remedial Casing Cementing 335.00 335.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3989 0.0 0.0 0.0
1993 1070 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

References